67 Reasons why wind turbines cannot replace fossil fuels

Source: Leonard, T. 2012. Broken down and rusting, is this the future of Britain’s ‘wind rush’?

Preface   Last updated 2023-10-20

  1. The most important problem to be solved is electrifying transportation, otherwise how can you deliver the 8,000 parts of a wind turbine to the assembly factory and deliver it to the final site? Or mine iron ore and get it to the ore crushing plant, or deliver cement to make the wind turbine platform, or truck 100-foot long tower pieces and  But the heavy duty cement, long haul trucks carrying the turbine, and cranes to lift the pieces into a 300 foot tall turbine run on diesel, not electricity. Batteries are so heavy class 8 trucks are not going to go far, if at all. No matter how much money you throw at truck batteries they are limited by the unbreakable laws of physics and thermodynamics.
  2. If you are able to defy the laws of physics and build a battery to electrify trucks, then you must be able to manufacture them (and more baby wind turbines).  But there are no electric ways to make cement, iron, other metals, glass and so on. Arc furnaces only remelt existing steel and downgrade it. Today 70% of steel is made from scratch with iron.
  3. If you can make a battery to electrify trucks and electrify manufacturing, you must greatly expand the existing transmission system to carry many times as much electricity as is used today to keep transportation and manufacturing running. It is unlikely enough wind and solar can be built, and it the electric grid ends when natural gas is scarce since energy storage doesn’t scale up (CAES, PHS, batteries)
  4. Lubricants, epoxy, plastics and other essential components of wind turbines are made out of petroleum.  So a way must be found to make them (and 500,000 other products) out of Something Else. 
  5. If you can do all of the above, the wind turbine must be able to construct energy storage devices to store excess electricity for times when the wind isn’t blowing.  There are only four choices. Three have limited places to put them — pumped hydro storage, compressed air, and concentrated solar plants with thermal storage. The only battery for which there are enough materials on earth to store one day of U.S. electricity generation are Sodium-Sulfur (NaS) batteries. They would weigh 450 million tons, take up 923 square miles, and need to be replaced every 15 years.  And you’d need at least 28 of them to cope with seasonal wind shortages of four weeks or more. 
  6. If you can electrify transportation and manufacturing, make essential components out of something besides fossil fuels, build 26,000 square miles of NaS batteries, then you’d need to build at least three or more times the number of wind turbines required to store excess electricity. And replace them every 20 years.
  7. If you can do all of the above, then every other product under the sun will need to be constructed with wind turbine (and solar) electricity before you can turn your lights, computer, and refrigerator on, or charge your electric car.

If we zero in on just the wind turbine life cycle it is smothered in diesel and coal. Gigantic mining trucks that can haul 300 tons of iron ore aided by trucks digging deep into the ground haul it to ships or rail to take to ore crushing and smelting facilities.  Blast furnaces to make iron and steel run around the clock for up to 22 years (any stoppage causes the lining to shatter so intermittent electricity won’t do). There are over 8,000 parts to a wind turbine which are delivered over global supply chains via petroleum-fueled ships, rail, air, and trucks to the assembly factory. There are 70 million Km of asphalted roads in the world. Wind turbines and solar panels and their raw materials depend on these roads, and the energy to build and maintain them. Roads are how the diesel cement trucks arrive at the wind turbine site to pour many tons of concrete while other diesel trucks carry segments of the wind turbine to the site and workers arrive in gas or diesel vehicles to assemble it.

Here are the 60 reasons (details below):

  1. Windmills require petroleum every single step of their life cycle. If they can’t replicate themselves using wind turbine generated electricity, they are not sustainable
  2. SCALE. Too many windmills needed to replace fossil fuels
  3. SCALE. Wind turbines can’t be built fast enough to replace fossils
  4. Not enough materials such as rare earth metals or fossil fueled heat to create the cement, steel, epoxy, and other parts needed
  5. Not enough dispatchable power, such as natural gas or hydropower, to balance wind intermittency and unreliability
  6. Wind blows seasonally, so for much of there year there isn’t much wind
  7. When too much wind is blowing for the grid to cope with and not blackout, it has to be curtailed and/or drives electricity prices to zero, driving natural gas, coal, and nuclear power plants out of business. If the wind is over 55 mph the wind turbine also has to shut down or risk being damaged
  8. The best wind areas will never be developed – they’re too far from cities and The Grid
  9. The Grid Can’t Handle Wind Power without natural gas, which is finite
  10. The role of the grid is to keep the supply of power steady and predictable. Wind does the opposite, at some point of penetration it may become impossible to keep the grid from crashing.
  11. Windmills wouldn’t be built without huge subsidies and tax breaks
  12. Tremendous environmental damage from mining material for windmills
  13. Not enough TIME left to scale wind up, world oil peaked in production in 2018, coal 2013
  14. The best wind is too high to capture
  15. Too many turbines could affect Earth’s climate negatively
  16. Wide-scale US wind power could cause significant global warming. A Harvard study raises questions about just how much wind should be part of a climate solution
  17. Less wind can be captured than thought (see Max Planck Society)
  18. Wind is only strong enough to justify windmills in a few regions
  19. The electric grid needs to be much larger than it is now
  20. Wind blows the strongest when customer demand is the weakest
  21. No utility scale energy storage in sight
  22. Wind Power surges harm industrial customers
  23. Energy returned on Energy Invested is negative
  24. Windmills take up too much space
  25. Wind Turbines break down too often
  26. Large-scale wind energy slows down winds and reduces turbine efficiencies
  27. Offshore Wind Farms likely to be destroyed by Hurricanes
  28. The costs of lightning damage are too high
  29. Wind doesn’t reduce CO2
  30. Turbines increase the cost of farming
  31. Offshore Windmills battered by waves, wind, ice, corrosion, a hazard to ships and ecosystems
  32. Wind turbines are far more expensive than they appear to be
  33. Wind turbines are already going out of business and fewer built in Europe
  34. TRANSPORTATION LIMITATIONS: Windmills are so huge they’ve reached the limits of land transportation by truck or rail
  35. Windmills may only last 12 to 15 years, or at best 20 years
  36. Not In My Back Yard – NIMBYism
  37. Offshore wind turbines could affect fisheries
  38. Lack of a skilled and technical workforce
  39. Wind only produces electricity, what we face is a liquid fuels crisis
  40. Wind has a low capacity Factor
  41. The quality of wind resources is location specific, with the best locations often found far from the load center where the transmission grid already exists
  42. Dead bugs and salt reduce wind power generation by 20 to 30%
  43. Small windmills too expensive, too noisy, unreliable, and height restricted
  44. Trucks are the basis of civilization, when diesel runs out, collapse will follow. Trucks can’t be electrified as shown in “When Trucks Stop Running: Energy and the future of transportation”
  45. Germany has been spending more for much longer than other nations, and Energiewiende is a huge failure
  46. Wind turbines more expensive to decommission than construct so often not recycled
  47. Transmission lines need to be much longer than for fossil plants, and likely to spark firestorms causing billions in damage
  48. Decommissioning wind turbines costs as much as $500,000 per wind turbine
  49. Wind turbines threaten biodiversity in hundreds of protected, key biodiversity, and wilderness areas
  50. Wind turbines and solar PV depend on the energy storage of coal and natural gas plants to provide power when the wind dies
  51. Operations and Maintenance (O&M) costs are too high
  52. Increasingly high insurance costs from hurricanes, wildfires, tornadoes, defective equipment, untrained personnel and more
  53. Turbines can’t be improved much, they are nearing the maximum possible harvesting of wind
  54. Blades need to be de-iced with helicopters in the winter
  55. Turbines are so heavy they damage roads during delivery
  56. The best, low-cost areas to build wind turbines were already been fully developed in several states
  57. Not enough metallurgical coal to make the steel for wind turbines
  58. When oil prices rise, the cost of building wind turbines rises
  59. Electricity can’t make cement, steel, glass, bricks, ceramics and more
  60. Wind turbines are ecologically destructive
  61. Take too long, too expensive despite energy shocks in the EU from Russia’s destruction of natural gas pipelines
  62. Supply chains: wind turbines need 10 times the materials of conventional energy technologies
  63. As more and more wind turbines are built, the average capacity factor goes down
  64. Wind turbines are buckling and toppling, splatting wind blades across fields below
  65. We can’t make wind turbines more efficient because we don’t understand turbulence
  66. Peak wind? Wind generation declined in 2023 for the first time since the 1990s
  67. Betz Limit of 59% — another 10-fold increase is not possible

Alice Friedemann  www.energyskeptic.com  Author of Life After Fossil Fuels: A Reality Check on Alternative Energy; When Trucks Stop Running: Energy and the Future of Transportation”, Barriers to Making Algal Biofuels, & “Crunch! Whole Grain Artisan Chips and Crackers”.  Women in ecology  Podcasts: WGBH, Jore, Planet: Critical, Crazy Town, Collapse Chronicles, Derrick Jensen, Practical Prepping, Kunstler 253 &278, Peak Prosperity,  Index of best energyskeptic posts

***

1. Windmills require petroleum every single step of their life cycle. If they can’t replicate themselves using wind turbine generated electricity, they are not sustainable

Fossil fuels are essential for making wind turbines, as Robert Wilson explains in Can You Make a Wind Turbine Without Fossil Fuels?

Oil is used from start to finish — from mining to crushing ore and smelting it, to delivery to the fabrication plant to the supply chains for 8,000 parts in a turbine to the final delivery site over 4 million miles of asphalt roads (in the U.S. alone) that need constant repair with diesel construction trucks laying more asphalt, which is found only at the bottom of a crude oil barrel. Cement trucks drive to the delivery site over roads built by diesel powered road equipment, fossil made cement and steel rebar to pour the foundations wind turbines sit on, diesel trucks haul the components of the turbine to the installation place, and diesel cranes lift the turbine sections and 8,000 parts upward. There are no electric blast furnaces, only fossil fueled ones to make cement and most steel, nor are there electric mining trucks, electric long haul trucks to deliver the 8,000 parts made all over the world, electric cement trucks, electric cranes, and so on. That means even if a wind turbine could generate enough energy to replicate itself, it wouldn’t matter, the process from start to finish needs to be electrified.

To build enough wind turbines to supply half of global electricity would require two billion tons of coal to create the concrete and steel, plus two billion barrels of oil to make the composite blades (Mills 2019). Then rinse and repeat. Wind turbines only have a 20-year lifespan.

Not only would windmills have to generate enough power to reproduce themselves, but they have to make enough power above and beyond that to fuel the rest of civilization. Think of the energy to make the cement and steel of a 300 foot tower with three 150 foot rotor blades sweeping an acre of air at 100 miles per hour.  The turbine housing alone weighs over 56 tons, the blade assembly 36 tons, and the whole tower assembly is over 163 tons.  Florida Power & Light says a typical turbine site is 42 by 42 foot area with a 30 foot hole filled with tons of steel rebar-reinforced concrete –about 1,250 tons to hold the 300 foot tower in place (Rosenbloom).

The fossil fuels to construct offshore wind turbines is even greater (Anderson 2017):

“The precise volume of fuel consumed when constructing and operating offshore wind farms significantly varies depending on vessel size, weather conditions, load, etc., but a jack-up vessel (used to install turbine foundations) uses approximately 2,640 gallons per day of marine fuel – or 63 barrels per day – according to guidance provided by consultancy BVG Associates. Constructing a 500 MW installation requires between 200 and 300 days of jack-up rig time, which means between 12,571 barrels (bbls) and 18,857 bbls of marine fuel consumed during construction. For comparison, Amtrak consumed about 1.6 million bbls of diesel fuel in 2014, according to the Bureau of Transportation statistics. So, the jack-up rig fuel requirements of building a 500 MW offshore wind farm account for 0.8% to 1.2% of the fuel annually consumed by Amtrak.

In addition to driving the foundations into the seabed, offshore wind farm construction and maintenance activities include laying export and array cables; port construction; offshore substation installation; turbine installation; and crew transfer for the 20-year lifespans of these installations. These activities are completed using vessels, that for the most part, run on marine fuel. Developing the potential offshore wind project sites identified to date along the east coast alone – not to mention the west and Hawaiian coasts – would require tens of thousands of barrels of petroleum.”

2. SCALE.  Too many windmills needed to replace fossil fuels

See point #4 in Energy Overview. Oil is butter-fried-steak wrapped in bacon. Alternative Energy is lettuce.

Consider the scale of trying to replace fossil fuels. Every hour 3.7 million barrels of oil are pumped from wells; 932,000 tons of coal are dug; 395 million cubic meters of natural gas are piped from the ground.  In that same hour, another 9,300 people are added to the global population. By 2100, the world will be home to 11 billion of us (Jones Energy Policy).

Consider just the wind power needed to replace offshore oil in the Gulf of Mexico: At 5.8 MBtu heat value in a barrel of oil and 3412 BTU in a kWh, 1.7 million barrels per day of gulf oil equals 2.9 billion kWh per day, or 1,059 billion kWh a year. Yet the total 2008 wind generation in Texas was 14.23 billion kWh, and 5.42 billion kWh in California. Which means you’d need 195 California’s, or 74 Texas’s of wind, and 20 years to build it (Nelder).

And then start the process over every 20 years, the very short lifespan of wind turbines, when energy will be required to dismantle the old one and replace it with a new one (15 years for offshore wind turbines due to corrosion).

3. SCALE.  Wind turbines can’t be scaled up fast enough to replace fossils

Wind turbines come in many shapes and sizes, and their numbers are growing. Yet, they provide only 4.4 % of United States electricity, 181,791,000 MWh. That’s equivalent to the power generated by 32,428 2-MW wind turbines. To supply half of America’s power with wind, another 332,600 2-MW turbines are needed.

They’re getting ridiculously huge, China is building wind turbines now with 131 meter / 430 foot long blades and overall diameter of 260 m / 850 feet.  They’re expensive to make, expensive to take down and recycle, and the logistics of moving them over land at such lengths incredibly challenging (Woodford 2024).

In the 11 states of the Western grid, if 35 % wind and solar were integrated, their intermittency would require 100 % backup from conventional sources such as natural gas and large hydro to maintain system reliability (NREL 2010a). So to get 100 % of electricity generation from wind, which is only blowing a third of the time on average (the capacity factor) requires building three times more reliable capacity to keep the system stable and backup wind when it isn’t blowing (CCST 2011).

So our 365,000 wind turbines need to be multiplied by at least three (plus energy storage) for a grand total of 1,095,000 wind turbines in a mostly renewable grid, and somehow connect even the most distant wind turbines in the remote regions of the Great Plains. That seems like the game is stacked against wind and solar, and that someone is moving the goalposts. Why three times more capacity? Read on. The capacity factor is how much power is actually generated, which is always a fraction of the theoretical maximum amount of power that could be obtained if the wind always blew at the optimum speed or every day was the sunniest day of the year.

Since the average wind capacity factor over a year is around 33 %, you need to build three times as much wind to provide power to the electric grid, and somehow connect them, if the goal is to replace nuclear and fossil generation, which theoretically could have 100 % capacity factors if grid operators chose to run them around the clock and needed no down time for maintenance. But that’s just an average, and there will be days when 300 % of what is needed would be generated and the excess would need to be stored or curtailed, and other days when less than 33 % was generated. The triple overkill is for reliability, to compensate for transmission losses, and make it more likely to have half of electricity power generation when needed. The record year for the most wind generation ever built in the U.S. was 2012, equivalent to 4819 2-MW turbines. If we tilted towards windmills and built that many a year starting in 2016, it would take 220 years to build 1,095,000 of them to generate half of our electricity. Since their life span is 20 years, even more time and windmills would actually be needed for construction (Davidsson et al. 2012, 2014).

And these statistics are for the U.S. alone. Multiply by 10 or more to provide wind energy to the whole world.

2019: Since  U.S. Production Tax Credits (PTCs) expire after 2020, there’s a race to install turbines before then, but supply chains can’t handle it – there aren’t enough gigantic cranes, special trucks to carry each segment of the turbine to the destination and accompanying highway escorts, increasing numbers of heavier parts, so up to a quarter of new wind energy capacity may be canceled or delayed (Munsell 2019).

4. Not enough rare earth metals and enormous amounts of cement, steel, and other materials required

This image has an empty alt attribute; its file name is IEA-2020-minerals-used-in-power-generation-technology.jpg

Rare metals, are, well, RARE.  China controls 95% of them, and Trump’s trade wars would be a great reason to withhold them from the U.S.  They could become a problem even before oil decline makes all goods and services scarcer.

Windmill Turbines depend on neodymium and dysprosium. Estimates of the exact amount of rare earth minerals in wind turbines vary, but in any case the numbers are staggering. According to the Bulletin of Atomic Sciences, a 2 megawatt (MW) wind turbine contains about 800 pounds of neodymium and 130 pounds of dysprosium. The MIT study cited above estimates that a 2 MW wind turbine contains about 752 pounds of rare earth minerals. Neodymium prices quadrupled this year, and that’s with wind still making up less than 3% of global electricity generation (Cembalest).

Energy decline will make it more and more costly to build turbines as the price of oil becomes unaffordatb.e The word “wind” belies the fact that these machines are not light and airy. Nor easily popped up. Each 2-MW wind turbine weighs 3,375,000 pounds (Guezuraga 2012; USGS 2011), equal to 102 18-wheeler trucks. The wind may be free, but wind turbines surely are not. Check out these videos showing the enormous amount of material and fossil energy required to build just one windmill, and the pictures in this post which capture the 900 short tons of materials used per wind turbine. Now imagine 1,641,999 more of them for the United States alone to provide half our power.

The limits to growth due to lack of material resources, especially rare earth metals for off-shore turbines (to reduce maintenance of gearboxes) would be reached long before then.

An onshore wind plant requires eight times as much minerals as a gas-fired plant of the same capacity (IEA 2020).

5. Not enough dispatchable power to balance wind intermittency and unreliability 

The DOE estimates there are 18,000 square miles of good wind sites in the USA, which could produce 20% of America’s electricity in total.  This would require over 140,000 1.5 MW towers costing at least $300 billion dollars, and innumerable natural gas peaking plants to balance the load when the wind isn’t blowing.  Natural gas production is likely to peak as soon as 2020 and we don’t have the Liquefied Natural Gas (LNG) facilities to import natural gas (NG) from other countries, and NG is finite, and LNG even more so since it takes so much energy to chill it and keep it chilled at -260 F (-160 C), and the LNG ship burns 20% of the LNG fuel to deliver it (and some escapes as well along the way).

There isn’t enough dispatchable renewable power from batteries, pumped hydro storage, biomass, or Compressed Air Energy storage to balance, provide peak power and store power for even one day of U.S. electricity generation (11.12 TWh).

6. Wind blows seasonally, so for much of there year there wouldn’t be enough wind

See my post on how seasonal wind is here.

As well-known energy analyst Vaclav Smil (2010) puts it:

“The Wind Energy Association’s website deals with “the intermittency myth” by claiming that “there is little overall impact if the wind stops blowing somewhere—it is always blowing somewhere else”. True, but that “somewhere else” may be hundreds or thousands of miles away with no high-voltage transmission lines in between. A new worldwide system where wind would be the single largest source of electricity would require such vast intra- and intercontinental extensions of HV transmission lines to create sufficiently dense and powerful interconnections to deal with wind’s intermittency that both its cost and its land claims would be forbidding.

The North American continent has a relatively high frequency of prolonged calms, especially in the Southeast which is basically a wind desert year round.  The Southeast would have to import large blocks of electricity from the Great  Midwest—but this arrangement would require a number of additional long-distance high-voltage lines.”

7. When too much wind is blowing for the grid to handle, it has to be curtailed and/or lowers electricity prices to zero, driving natural gas, coal, and nuclear power plants out of business

According to the MIT Technology Review (Martin 2016):

“In places with abundant wind and solar resources, like Texas and California, the price of electricity is dipping more and more frequently into negative territory. In other words, utilities that operate big fossil-fuel or nuclear plants, which are very costly to switch off and ramp up again, are running into problems when wind and solar farms are generating at their peaks. With too much energy supply to the grid, spot prices for power turn negative and utilities are forced to pay grid operators to take power off their hands.

That’s happened on about a dozen days over the past year in sunny Southern California, according to data from Bloomberg, and it’s liable to happen more often in the future. “In Texas, power at one major hub traded below zero for almost 50 hours in November and again in March,” according to the state’s grid operator. In Germany, negative energy prices have become commonplace, dramatically slashing utility revenues despite renewable energy subsidies that bolster electricity prices much more than in the United States.

The first solution to below-zero prices is to build more transmission to ship the power to places where demand is high. Germany now makes close to 2 billion euros a year off energy exports to neighboring countries, according to Berlin’s Fraunhofer Institute. But building out new long-distance, high-voltage transmission lines is expensive: Texas has spent $7 billion on transmission lines to ship power from the windy flatlands of west Texas to Dallas and Houston.”

In the news:

2022 Wind generators turned off sometimes to prevent Texas power grid from overloading

8. The best wind areas will never be developed

Most of the best wind in the U.S. will never be developed — it is too far from cities, too far from existing transmission lines to harvest, or offshore the west coast where the ocean is too deep to build windmills.

wind resources and densely populated hubs in the US. It appears that only Minneapolis is near good (but not excellent, outstanding, or superb) wind. Source: NREL 2012. Download from the dynamic maps, GIS data, & analysis too webpage (http:/www.nrel.gov/gis/wind.html)

wind resources and densely populated hubs in the US. It appears that only Minneapolis is near good (but not excellent, outstanding, or superb) wind. Source: NREL 2012. Download from the dynamic maps, GIS data, & analysis too webpage (http:/www.nrel.gov/gis/wind.html)

Many sites with the nation’s best wind power resources have minimal or no access to electrical transmission facilities.

The best wind is far from the electric grid, and remote wind farms often need millions, or even billions of dollars in transmission lines – an overall $8 billion dollar project will send power from a 2,100 MW $4 billion Wyoming wind farm, $1.5 billion for a new CAES facility in Utah — the only salt cavern west big enough to do this, and $2.6 billion to run 525 miles of transmission lines from Wyoming to Utah to California (DATC, Gruver).  CAES are fossil fuel dependent — they’re basically a gas turbine that needs 40-60% less natural gas. The storage facility could yield 1,200 MW of electricity, enough to power 1.2 million California homes.  So whatever happened to the other 900 MW generated by the wind farm?  Add on operation and maintenance costs, the short longevity of a wind farm — 20 years at best — and the fossil fuel energy to fabricate all this steel, cement, aluminum, power the CAES, etc., and you have to wonder how sustainable “wind” power really is when it’s so fossil fuel dependent.

Just as oil doesn’t do much useful work when not burned within a combustion engine, wind needs a vast, interconnected grid or immense energy storage technologies (batteries, natural gas combustion turbines, etc).  The larger the grid, the more wind that can be added to it.  But we don’t have that infrastructure — indeed, what we do have now is falling apart due to deregulation of utilities, with no monetary rewards for any player to maintain or upgrade the grid.

Most of the really good, strong wind areas are so far from cities that it’s useless because the energy to build a grid extending to these regions would use more energy than the wind would provide.

Sure, oil and natural gas require pipelines too, but they’re already in place, built back when the EROEI of oil was 100:1 — though.

We now turn to the matter of adequate interconnections, which in theory looks fairly promising. A study by the National Renewable Energy Laboratory found that the United States has 175 GW of potential wind capacity located within 5 miles of existing lines carrying up to 230 kV, 284 GW within 10 miles of such lines, and 401 GW within 20 miles of such lines.35 But what matters more than distance to the nearest transmission line is that line’s capacity, and in this respect it is obvious that the situation in the United States is much inferior to that in Europe.

Europe has strong and essentially continent-wide north–south as well as east–west connections, while the United States does not have a comparably capable national network: high-voltage connections from the heart of the continent, where the wind potential is highest, to either coast are minimal or nonexistent. Consequently, the Dakotas could not become a major supplier to California or the Northeast without massive infrastructural additions. Jacobson and Masters argue that with an average cost of $310,000/km (an unrealistically low mean; see the next section), the construction of 10,000 km of new HV lines would cost only $3.1 billion, or less than 1 percent of the cost of 225,000 new turbines, and that HV direct current lines would be even cheaper.36 As with any entirely conceptual megaproject, these estimates are highly questionable; moreover, such an expansion is not very likely, given that the existing grid (aging, overloaded, and vulnerable) is overdue for extensive, and very expensive, upgrading,37 and that securing rights of way may be a greater challenge than arranging the needed financing (Smil 2010).

9. The Grid Can’t Handle Wind Power without natural gas, which is finite

According to Eon Netz, one of the four grid managers in Germany, for every 10 MW of wind power added to the system, at least eight MW of back-up power must also be dedicated.  So you’re not saving on fossil fuels and often have to ADD fossil fuel plants to make up for the wind power when the wind isn’t blowing!  In other words, wind needs almost 100% back-up of its maximum output.

Denmark is often pointed out as a country that scaled wind up to provide 20% of its power.   Yet because wind is so intermittent, no conventional power plants have been shut down because they need to step in when the wind isn’t blowing (enough).  The quick ramping up and down of these power plants actually increases greenhouse gas emissions.  And when the wind does blow enough, the power is surplus and most is sold to other countries at an extremely cheap price.  And often the Danes have to import electricity, paying the highest electricity prices in Europe.  The actual capacity is 20%, not the 30% the BWEA and AWEA claim is possible (Rosenbloom).

Power struggle: Green energy versus a grid that’s not ready. Minders of a fragile national power grid say the rush to renewable energy might actually make it harder to keep the lights on. Evan Halper, Dec 2, 2013. Los Angeles Times.

The grid is built on an antiquated tangle of market rules, operational formulas and business models.  Planners are struggling to plot where and when to deploy solar panels, wind turbines and hydrogen fuel cells without knowing whether regulators will approve the transmission lines to support them.

Energy officials worry a lot these days about the stability of the massive patchwork of wires, substations and algorithms that keeps electricity flowing. They rattle off several scenarios that could lead to a collapse of the power grid — a well-executed cyberattack, a freak storm, sabotage.

But as states race to bring more wind, solar and geothermal power online, those and other forms of alternative energy have become a new source of anxiety. The problem is that renewable energy adds unprecedented levels of stress to a grid designed for the previous century.

Green energy is the least predictable kind. Nobody can say for certain when the wind will blow or the sun will shine. A field of solar panels might be cranking out huge amounts of energy one minute and a tiny amount the next if a thick cloud arrives. In many cases, renewable resources exist where transmission lines don’t.

“The grid was not built for renewables,” said Trieu Mai, senior analyst at the National Renewable Energy Laboratory.

The first chart below is the “Mona Lisa” of wind unreliability, measured at one of California’s largest wind farms. The second is from the California Independent System Operator, showing how wind power tends to be low when power demand is high (and vice-versa). Wind should play an important role, but unless there is a high-voltage, high-capacity, high-density grid to accompany it (as in Northern Europe), or electricity storage, the variability of wind means that co-located natural gas peaking plants are needed as well. The cost of such natural gas plants are rarely factored into the EROI or LCOE costs of wind (Cembalest).

Also: German grid aching under solar power

10. The grid blacks out when the supply of power varies too much. Eventually too much wind penetration will crash the grid.

To keep the grid from crashing, it has to be kept within a narrow range. To do this, about 10% of the electricity on the grid is never delivered to a customer, it’s there to balance the flow so that surges don’t cause blackouts leading to the loss of power for millions of people.

Engineers carefully calibrate how much juice to feed into the system. The balancing requires painstaking precision. A momentary overload can crash the system.

Wind and solar generate just a tiny amount of energy now, but at some point their unpredictability, surges to nothingness, and intermittency will be too large a percent of the grid to manage, and crash the grid.

11. Windmills wouldn’t be built without huge subsidies and tax breaks

Wind speed matters.  Wind power increases with the cube of the wind speed. Doubling the wind speed gives eight times more wind power. Therefore, the selection of a high-wind-speed location is very important. For example, the difference between wind blowing at 10 mph and 12.6 mph is 100%  (IEC).

Clearly wind farms built where wind speeds are class 4 or higher will be more profitable. California, Oregon, and Washington have already built out their best class 4+ resources (see reason #56). Outlying areas with good wind need billions of dollars of new transmission lines for which it can take ten years to get a permit to build, or never be approved.  to remote high-wind areas before wind farms could be built.

As it is, a great deal of wind farms wouldn’t be built without subsidies.  Warren Buffet has said that he only invests in wind energy because “we get a tax credit if we build a lot of wind farms. That’s the only reason to build them. They don’t make sense without the tax credit” (Pfotenhauer). So for taxpayers to subsidize wind farms in less than optimal locations is outrageous and does nothing to cope with energy decline and the need for new kinds of infrastructure and transportation in a post carbon world.

Todd Kiefer: Just crunched an “EIA report to Congress on energy subsidies (http://www.eia.gov/analysis/requests/subsidy/pdf/subsidy.pdf).  In 2010 wind was subsidized at 2.16 cent/kWh and solar at 3.13 cent/kWh.   In 2013 (latest data available), wind was subsidized at 1.31 cent/kWh and solar at 6.36 cent/kWh.  Makes it easier to see why there are solar PPAs out there for 4 cent/kWh.

Full table of subsidies normalized to units of energy delivered is below.  M$ is million dollar.  Quad is quadrillion BTU.  BOE is barrel of oil equivalent.  Subsidies do not take into account offsetting federal revenues such as fees, permits, leases, excise taxes, corporate income taxes, etc.  Oil and gas generates a 2,000% return on these subsidies in federal corporate income and excise taxes alone (> $9/barrel).  Then there are the taxes from the 185,000 people directly employed in the oil and gas industry.  I haven’t researched coal in as much detail, but I’m sure the government gets a positive return.  Non-hydro renewables, on the other hand are surely net negative.”

Energy resource subsidies from http://www.eia.gov/analysis/requests/subsidy/pdf/subsidy.pdf

Energy resource subsidies from http://www.eia.gov/analysis/requests/subsidy/pdf/subsidy.pdf

 

 

 

 

 

 

12. Tremendous environmental damage from mining material for windmills

Mining 1 ton of rare earth minerals produces about 1 ton of radioactive waste, according to the Institute for the Analysis of Global Security. In 2012, the U.S. added a record 13,131 MW of wind generating capacity. That means that between 4.9 million pounds (using MIT’s estimate) and 6.1 million pounds (using the Bulletin of Atomic Science’s estimate) of rare earths were used in wind turbines installed in 2012. It also means that between 4.9 million and 6.1 million pounds of radioactive waste were created to make these wind turbines — more than America’s nuclear industry, which produces between 4.4 million and 5 million pounds of spent nuclear fuel each year.

Yet nuclear energy comprised about one-fifth of America’s electrical generation in 2012, while wind accounted for just 3.5 percent of all electricity generated in the United States.

Not only do rare earths create radioactive waste residue, but according to the Chinese Society for Rare Earths, “one ton of calcined rare earth ore generates 9,600 to 12,000 cubic meters (339,021 to 423,776 cubic feet) of waste gas containing dust concentrate, hydrofluoric acid, sulfur dioxide, and sulfuric acid, [and] approximately 75 cubic meters (2,649 cubic feet) of acidic wastewater.”

The environmental impact of mining the rare metals required for windmills makes their use questionable.  Mongolia has large reserves of rare earth metals, especially neodymium, the element needed to make the magnets in wind turbines.  Its extraction has led to a 5-mile wide poisonous tailings lake in northern China.  Nearby farmland for miles is now unproductive, and one of China’s key waterways is at risk. “This vast, hissing cauldron of chemicals is the dumping ground for seven million tons a year of mined rare earth after it has been doused in acid and chemicals and processed through red-hot furnaces to extract its components.  Rusting pipelines meander for miles from factories processing rare earths in Baotou out to the man-made lake where, mixed with water, the foul-smelling radioactive waste from this industrial process is pumped day after day” (Parry).

13. Not enough time to scale wind up

Like solar, wind accounts for only a tiny fraction of renewable energy consumption in the United States, about a tenth of one percent, and will be hard to scale up in the short time left. EIA. June 2006. Renewable Energy Annual.

14. The best wind is too high or remote to capture

Only the winds moving in the lowest few hundred meters above the surface can be intercepted. All the wind above a windmill is now unavailable.

Windmill “kites” were proposed decades ago, but are unlikely to work out, winds can be too strong, difficult to take down before a hurricane, tornado, or large storm, kites could fall onto developed areas, airplane traffic would need to be rerouted, and the line from the kite to the electricity generator likely to be too heavy for the kite, or short-circuit if too thin.

There are several research groups looking at generating electricity using giant kites up in the jet stream. But it won’t be easy.  Jet streams move around and change their location, airplanes need to stay well away, and lightning and thunderstorms might require them to be brought down.

The strongest wind is 6 miles above us, where winds are typically 60 miles per hour.  Some scientists think there’s enough wind to generate 100 times current global energy demand.

But Axel Kleidon and Lee Miller of the Max Planck Institute for Biogeochemistry believe that’s a massive overestimate of the amount of energy that could be obtained. If they’re right that jet stream wind results from a lack of friction, then at most 7.5 TW of power could be extracted, and that would have a major effect on climate (Earth System Dynamics, vol 2, p 201).

Globally we use about 12 terawatts of energy a year. There’s 85 terawatts of wind, but most of it is over the deep ocean, or the many miles above, which we are unlikely to ever capture.

And on top of all these problems,  windmills are built to capture wind only at certain ranges of speeds, so when the wind is too light or too strong, power is not generated.

15. Too many turbines could affect Earth’s climate negatively

A transition to wind or solar power in the U.S. would require five to 20 times more land than previously thought, and, if such large-scale wind farms were built, would warm average surface temperatures over the continental U.S. by 0.24 degrees Celsius. Wind power can impact the climate by altering the atmospheric boundary layer, with at least 40 papers and 10 observational studies now linking wind power to climatic impacts. We make the first comparison between the climatic impacts of large-scale wind power and site-scale observations, finding agreement that warming from wind turbines is largest at night. Wind power’s climatic impacts will continue to expand as more are installed. Wind’s climatic impacts are about 10 times larger than solar photovoltaic systems per unit energy generated (Miller and Keith 2018, Miller and Keith 2021).

Scientists do not know the maximum share of global atmospheric circulation that could be converted into electricity without changing the earth’s climate. Models of atmospheric circulation indicate that the very large-scale extraction of wind (requiring installed capacities on a TW scale needed to supply at least a quarter of today’s demand) reduces wind speeds and consequently lowers the average power density of wind-driven generation to around 1 W/m2 on scales larger than about 100 km (Smil).

The maximum extractable energy from high jet stream wind is 200 times less than imagined initially, and trying to extract them would profoundly impact the entire climate system of the planet.  If we tried to extract the maximum possible 7.5 TW from the jet stream, “the atmosphere would generate 40 times less wind energy than what we would gain from the wind turbines, resulting in drastic changes in temperature and weather” according to Lee Miller, the author of the study (Miller).

Scientists modeled the impact of a hypothetical large-scale wind farm in the Great Plains. Their conclusion in The Journal of Geophysical Research, is that thousands of turbines concentrated in one area can affect local weather, by making warmer drier conditions from the atmospheric mixing in the blades wake.  The warming and drying that occur when the upper air mass reaches the surface is a significant change, Dr. Baidya Roy said, and is similar to the kinds of local atmospheric changes that occur with large-scale deforestation (2Nov 2004. Catch the Wind, Change the Weather. New York Times.

“We shouldn’t be surprised that extracting wind energy on a global scale is going to have a noticeable effect. … There is really no such thing as a free lunch,” said David Keith, a professor of energy and the environment at the University of Calgary and lead author of a report in the Proceedings of the National Academy of Sciences.

Specifically, if wind generation were expanded to the point where it produced 10% of today’s energy, the models say cooling in the Arctic and a warming across the southern parts of North America should happen.

The exact mechanism for this is unclear, but the scientists believe it may have to do with the disruption of the flow of heat from the equator to the poles.

16. Wide-scale US wind power could cause significant global warming. A Harvard study raises questions about just how much wind should be part of a climate solution (Temple 2018)

Researchers found that a high amount of wind power could mean more climate warming regionally and in the decades ahead, raising serious questions about how much nations should look to wind power to clean up electricity systems.  The study, published in the journal Joule, found that if wind power supplied all US electricity demands, it would warm the surface of the continental United States by 0.24 °C. That could significantly exceed the reduction in US warming achieved by decarbonizing the nation’s electricity sector this century, which would be around 0.1 °C.

Our analysis suggests that it may make sense to push a bit harder on developing solar power and a bit less hard on wind, since the warming effect from wind was 10 times greater than the climate effect from solar farms, which can also have a tiny warming effect.

17. Less wind can be captured than thought (see Max Planck Society)

Large wind farms with a high density of installed capacity slow down the wind and generate less electricity than previously thought Image Large wind farms with a high density of installed capacity slow down the wind and generate less electricity than previously thought.  Less energy can be withdrawn from wind than was assumed up to now. For example, a previous prediction from a 2013 study by the German Federal Environmental Agency concluded that almost seven watts of electrical power per square meter could be generated from wind energy. However, an international research team led by scientists from the Max Planck Institute for Biogeochemistry in Jena has now shown that the amount of energy actually possible from wind power is considerably lower. These researchers calculated that a maximum of 1.1 watts of electricity could be generated per square metre over a large (105 km2) wind farm in the windy state of Kansas, United States (Miller 2014).

18. Wind is only strong enough to justify wind power in a few regions

In 2018, just 9 states accounted for 74% of wind generation.  So the dreams of other states going 100% renewable is a dream, they don’t have the wind to do that, and quite possibly not enough sunshine either to add more solar power — 9 states account for 88% of solar generation (Gattie 2019).

For the wind to even turn the blades at all, it has to be at a cut-in speed of from 6 to 9 mph. And stop when the wind reaches 55 mph or be damaged.

to be profitable, the wind needs to be at least force level 4 (13-18 mph) for as much of the year as possible to make it economic. This means that a great deal of land is not practical for the purpose.  The land that is most suitable already has windmills, or is too far from the grid to be connected, or has no subsidies to hand out.

A Class 3 windmill farm needs double the number of turbines to produce the same amount of energy as windmills in a class 6 wind farm (Prieto).

The 1997 US EIA/DOE study (2002) came to the remarkable conclusion that “…many non-technical wind cost adjustment factors … result in economically viable wind power sites on only 1% of the area which is otherwise technically available…”

19. The electric grid needs to be much larger than it is now

Without a vastly expanded grid to balance the unpredictability of wind over a large area, and across seasons, wind can’t provide a significant portion of electrical generation.  But expanding the grid to the proper size would cost trillions of dollars. NIMBY has stopped this from happening, will continue to provide opposition, and states don’t like transmission lines to cross their borders. So it is very unlikely we will ever have a national grid, which would also make us more vulnerable to terrorism, accidents, and can actually be less, not more stable than the regional grids we have today.

Much of the land in the USA (the areas where there’s lots of wind) is quite far from population centers. And when you hook windmills to the grid, you lose quite a bit of energy over transmission lines.

It also takes a lot of energy to build and maintain the electric grid infrastructure itself. Remote wind sites often result in construction of additional transmission lines, estimated to cost as much as $300,000-$1 million per mile. (Energy Choices in a Competitive Era, Center for Energy and Economic Development Study, 1995 Study, p. 14). The economics of transmission are poor because while the line must be sized at peak output, wind’s low capacity factor ensures significant under-utilization.

As you can see in the chart below, a large balancing area (and sub-hourly energy markets) are the most important factors in integrating wind into the power grid:

System flexibility increases as the color of the numbered boxes progresses from red to green, and as the number increases from 1 to 10. The items at the top of the table are those attributes that help efficiently integrate wind power into power systems operation. Although the table uses a simplistic 1–10 scoring system, it has proven useful as a high-level, qualitative tool. The red, yellow, and green result cells show the ease (green) or difficulty (red) that a hypothetical system would likely have integrating large amounts of wind power. RTO is regional transmission organization; ISO is independent system operator. Source: Milligan, M.; et al. Oct 22, 2013. Wind Integration Cost and Cost-Causation. 12th Annual International Workshop on Large-Scale Integration of Wind Power into Power Systems as Well as on Transmission Networks for Offshore Wind Power Plants. NREL/CP-5D00-60411. National Renewable Energy Laboratory

System flexibility increases as the color of the numbered boxes progresses from red to green, and as the number increases from 1 to 10. The items at the top of the table are those attributes that help efficiently integrate wind power into power systems operation. Although the table uses a simplistic 1–10 scoring system, it has proven useful as a high-level, qualitative tool. The red, yellow, and green result cells show the ease (green) or difficulty (red) that a hypothetical system would likely have integrating large amounts of wind power. RTO is regional transmission organization; ISO is independent system operator. Source: Milligan, M.; et al. Oct 22, 2013. Wind Integration Cost and Cost-Causation. 12th Annual International Workshop on Large-Scale Integration of Wind Power into Power Systems as Well as on Transmission Networks for Offshore Wind Power Plants. NREL/CP-5D00-60411. National Renewable Energy Laboratory

20. Wind blows the strongest when customer demand is the weakest

In Denmark, where some of the world’s largest wind farms exist, wind blows the hardest when consumer demand is the lowest, so Denmark ends up selling its extra electricity to other countries for pennies, and then when demand is up, buys electricity back at much higher prices.  Denmark’s citizens pay some of the highest electricity rates on earth (Castelvecchi).

In Texas and California, wind and solar are too erratic to provide more than 20% of a regions total energy capacity because it’s too difficult to balance supply and demand beyond that amount.

Wind varies greatly depending on the weather. Often it hardly blows at all during some seasons.  In California, we need electricity the most in summer when peak loads are reached, but that’s the season the least wind blows.  On our hottest days, wind capacity factors drop to as low as .02 at peak electric demand. At a time when the system most needs reliable base load capacity, wind base capacity is unavailable.

21. No utility scale energy storage in sight

We don’t have EROEI-positive batteries, compressed air, or enough pumped water dams to store wind energy and concentrate it enough to do useful work and generate power when the wind isn’t blowing.  There are no power to gas, hydrogen, or any other fantasy storage methods even close to commercial development.

Nor are there ever going to be storage methods that can return the same amount of energy put into them, so having to store energy reduces the amount of energy returned.

Compressed air storage is inefficient because “air heats up when it is compressed and gets cold when it is allowed to expand.  That means some of the energy that goes into compression is lost as waste heat.  And if the air is simply let out, it can get so cold that it freezes everything it touches, including industrial-strength turbines.  PowerSouth and E.ON burn natural gas to create a hot gas stream that warms the cold air as it expands into the turbines, reducing overall energy efficiency and releasing carbon dioxide, which undermines some of the benefits of wind power” (Castelvecchi).

Many posts on energy storage are here: https://energyskeptic.com/category/energy/energy-storage/

22. Wind Power surges harm industrial customers

Japan’s biggest wind power supplier, may scrap a plan to build turbines on the northern island of Hokkaido after the regional utility cut proposed electricity purchases, blaming unreliable supply. Power surges can be a problem for industrial customers, said Hirotaka Hayashi, a spokesman at Hokkaido Electric. Utilities often need to cut back power generation at other plants to lessen the effect of excess power from wind energy.

“Continental European countries such as Germany and Denmark can transfer excess power from windmills to other countries,” said Arakawa. “The electricity networks of Japan’s 10 utilities aren’t connected like those in Europe. That’s the reason why it’s difficult to install windmills in Japan.”

To ensure steady supply, Tohoku Electric Power Co., Japan’s fourth-biggest generator, in March started requiring owners of new windmills to store energy in batteries before distribution rather than send the electricity direct to the utility, said spokesman Satoshi Arakawa. That requirement has increased wind project installation costs to 300,000 yen ($2,560) per kilowatt, from 200,000 yen, according to Toshiro Ito, vice president of EcoPower Co., Japan’s third-biggest wind power supplier (Takemoto).

23. Energy returned on Energy Invested is negative

If the energy costs of intermittency, back-up conventional plant, and grid connection were added to the “cost” of windfarms, the EROEI would be far lower than current EROEI studies show.

Wind farms require vast amounts of steel and concrete, which in terms of mining, fabrication, and transportation to the site represent a huge amount of fossil fuel energy. The Zond 40-45 megawatt wind farm is composed of 150 wind turbines weighing 35 tons each — over 10 million pounds.

The 5,700 turbines installed in the United States in 2009 used 36,000 miles of steel rebar and 1.7 million cubic yards of concrete (enough to pave a four-foot-wide, 7,630-mile-long sidewalk). The gearbox of a 2-megawatt wind turbine has 800 pounds of neodymium and 130 pounds of dysprosium — rare earth metals that are found in low-grade hard-to-find deposits that are very expensive to make. (American Wind Energy Association).

Materials like carbon fiber that would make them more efficient cost  several times more and use up a great deal more fossil fuel energy to fabricate than a fiber glass blade.

From the mining of the metals to make windmills, to their fabrication, delivery, operation, to their Maintenance is very dependent upon fossil fuel energy and fossil fuel driven machinery. Wind energy at best could increase the amount of energy generated while fossil fuels last, but is too dependent on them to outlast the oil age.

After a few years, maintenance costs skyrocket.  The larger the windmill, the more complex maintenance is needed, yet the larger the windmill, the more wind can be captured.

24. Windmills take up too much space

Harvard University researchers find that it would take wind farms stretching over one-third of the U.S. to meet present-day U.S. electricity demand, 5 to 20 times more land than previously thought, and, if such large-scale wind farms were built, would warm average surface temperatures over the continental U.S. by 0.24 degrees Celsius (Miller and Keith 2018, Miller and Keith 2021).

In 2013 research, Keith described how each wind turbine creates a “wind shadow” behind it where air has been slowed down by the turbine’s blades. Today’s commercial-scale wind farms carefully space turbines to reduce the impact of these wind shadows, but given the expectation that wind farms will continue to expand as demand for wind-derived electricity increases, interactions and associated climatic impacts cannot be avoided. A few months ago, the U.S. Geological Survey released the locations of 57,636 wind turbines around the U.S., and in combination with other data, Keith was able to quantify the power density of 411 wind farms and 1,150 solar photovoltaic plants operating in the U.S. during 2016. For wind, it was found that the average power density — meaning the rate of energy generation divided by the encompassing area of the wind plant — was up to 100 times lower than estimates by some leading energy experts, because most of these estimates failed to consider the turbine-atmosphere interaction. For an isolated wind turbine, interactions are not important at all, but once the wind farms are more than five to 10 kilometers deep, these interactions have a major impact on the power density. This research suggests that not only will wind farms require more land to hit the proposed renewable energy targets but also, at such a large scale, would become an active player in the climate system.

A wind farm takes up 700 times more land to produce the same amount of energy from wind as from natural gas.  And land is, in fact, scarce. We use 40% of the world’s land for farming, and as the human population grows, we will need to produce 50% more calories by 2050 (Shellenberger 2019).

A 50 megawatt wind farm can take up anywhere from two to twenty-five square miles (Proceedings of National Avian-Wind Power Planning Meeting, p. 11).

Vast amounts of land are required for wind turbines, which have to be spaced far apart since on the other side of a windmill that has just “captured” wind, there’s no wind left.  For example, if the best possible wind strip along the coast between San Francisco and LA were covered with the maximum possible number of windmills (an area about 300 miles long by one mile deep) you’d get enough wind, when it was blowing, to replace only one of the dozens of power plants in California (Hayden).

Development of a wind power plant results in a variety of temporary and permanent disturbances, including land occupied by wind turbine pads, access roads, substations, service buildings, and other infrastructure which physically occupy land area, or create impermeable surfaces. Additional direct impacts are associated with development in forested areas, where trees must be cleared around each turbine. Land modified for wind farms represents a potentially significant degradation in ecosystem quality (Arnett).

Supplying half of today’s electricity—that is, about 9 PWh—by wind would thus require about 4.1 TW of wind turbines; with 2 W/m2, they would claim about 2 million km2 (772,204 square miles), or an area roughly four times the size of France or larger than Mexico. With average power density of just 1 W/m2, the required area would rise to more than 4 million km2 (1,544,408 square miles), roughly an equivalent of half of Brazil or the combined area of Sudan (Africa’s largest country) and Iran. These calculations indicate that deriving substantial shares of the world’s electricity from wind would have large-scale spatial impacts. Obviously, only a small portion of those areas would be occupied by turbine towers and transforming stations, so that crop planting and animal grazing could take place close to a tower’s foundations. But even when assuming a large average turbine size of 2–3 MW, the access roads (which are required to carry heavy loads, as the total weight of foundations, tower, and turbine is more than 300 tons per unit) needed to build roughly 2 million turbines and new transmission lines to conduct their electricity would make a vastly larger land claim than the footprint of the towers; and a considerable energy demand would be created by keeping these roads, often in steep terrain, protected against erosion and open during inclement weather for servicing access (Smil).

The U.S. energy infrastructure, including the right of way for all high-voltage transmission lines, now occupies up to about 25,000 km2 (9,650 square miles), or 0.25 percent of the country’s area, roughly equal to the size of Vermont (Smill 2008). And the country’s entire impervious surface area of paved and built-up surface reached about 113,000 km2 (43,630 square miles) by the year 2000 (Elvidge). In contrast, relying on large wind turbines to supply all U.S. electricity demand (about 4 PWh) would require installing about 1.8 TW of new generating capacity, which (even when assuming an average of 2 W/m2) would require about 900,000 km2 of land (347,500 square miles)—nearly a tenth of the country’s land, or roughly the area of Texas and Kansas combined (Smil).

In practice, the area per windmill varies quite a bit, averaging about 50 acres per megawatt of capacity because they interfere with each other and need to be widely spaced apart.

aweo.org estimates:

Tom Gray of the American Wind Energy Association has written, “My rule of thumb is 60 acres per megawatt for wind farms on land.”

That may still not be enough for maximum efficiency. More recent research at Johns Hopkins University by Charles Meneveau suggests that large turbines in an array need to be spaced 15 rotor diameters apart, increasing the above examples to 185-250 acres required per installed megawatt.

Note that larger turbines are not substantially more efficient than small ones, because they require proportionally more space.

Remember that capacity is different from actual output. Typical average output is only 25% of capacity, so the area required for a megawatt of actual output is four times the area listed here for a megawatt of capacity. And because three-fifths of the time wind turbines produce power at a rate far below average, even more (2.5×, perhaps, for a total of 10×) — dispersed across a wide geographic area — would be needed for any hope of a steady supply.

Wind power is a good example of how the target of “industrial scale” energy production is wastefully using land, and creating a public backlash against renewable energy in the process. The larger the wind turbine, the further apart they must be spaced within wind farms, and consequently the lower the energy yield per hectare of land. Working theoretically, a large wind 2.3MW turbine (such as a Nordic N90 turbine) spaced five hub heights apart (an average separation distance) from other turbines has a capacity of 108 kiloWatts per hectare (kW/ha). However three 850kW turbines (such the Vestas V52) would occupy the same area of land, and even though they are 40% shorter they produce more power—111kW/ha (note, this figure includes a weighting that reflects the V52’s lower height). The reason that wind farm developers are building ever larger turbines is quite simple: Whilst capital costs can be discounted over future years, maintenance costs are always at the present value. Consequently the development of fewer, larger turbines increases the power output whilst reducing maintenance costs—increasing the return on the capital invested.

Taking the 111kW/ha figure as a representative energy density for wind, to match the UK’s major electricity generators 73,308 mega-Watts (MW) of net installed capacity [DUKES, 2005g], and assuming that the turbines generated for 30% of the time and that an additional 40% of capacity was required to charge batteries/fuel cells to provide a continuous power output, just over 3,000,000 hectares of turbines would be required—equivalent to around 13% of the UK’s land area. Theoretically then, we could generate our power requirements from wind turbines. But, as noted above, electricity is less than one-fifth of the UK’s total energy consumption, so this solution this would only answers a small part of the UK’s energy problem—for a total solution we’d have to densely cover half the UK’s land area in wind turbines (parliament.uk).

Even in windy regions (power class 4, 7–7.5 m/s at 50 meters above ground) such as the Dakotas, northern Texas, western Oklahoma, and coastal Oregon, where wind strikes the rotating blades with power density averaging 450 W/m2, the necessary spacing of wind turbines (at least five, and as much as ten, rotor diameters apart, depending on the location, to reduce excessive wake interference) creates much lower power densities per unit of land. For example, a large 3 MW Vestas machine with a rotor diameter of 112 meters spaced six diameters apart will have peak power density of 6.6 W/m2, but even if an average load factor were fairly high (at 30%), its annual rate would be reduced to only about 2 W/m2 (Smil).

25. Wind Turbines break down too often

DOE. 2014. Wind vision a new era for wind power in the United States. Department of Energy:

  1. Gearbox Reliability. A 2013 summary of insurance claims revealed that the average total cost of a gearbox failure was $380,000. An analysis of 1000 turbines over a 10-year period reported that 5% of turbines per year required a gearbox replacement [29]. Gearbox reliability remains a challenge for utility-scale wind turbines.
  2. Generator Reliability. A generator failure in 2013 was estimated to cost $310,000, while an estimated 3.5% of turbines required a generator replacement.
  3. Rotor Reliability. Average replacement costs for a blade failure are estimated at $240,000, with 2% of turbines requiring blade replacements annually. With larger blades being used on wind turbines, weight and aeroelastic limitations have put added pressure on blade design and manufacturing, which may be one of the explanations for the uptick in rotor-driven downtime. Blade failure can arise from manufacturing and design flaws, transportation, and operational damage. Manufacturing flaws include fiber misalignment, porosity, and poor bonding.  During transport from the manufacturing plant to the wind plant site, blades can undergo several lifts, which result in localized loads that can cause damage if not properly executed. Operational damage is primarily related to either lightning strikes or erosion of blade leading edges.

Nate Glessner, manager at H&N Electric, says he’s seeing more wind turbine generators break down before they are 5 years old — way earlier than their expected 20-year lifespan (Seattlepi 2019).

Now I know anecdotes are not good evidence, but still — much about what’s going on in the wind industry is a secret because it’s privately owned so problems don’t have to be reported to the public.  So unlike the extraordinary expose of solar power in Spain, where the government paid for the solar farms and performance was public, so far no one has written an honest account of a wind farm.  So here’s an anecdote, for what it’s worth from an installer of wind turbine farms for a major manufacturer in Alberta the past two years (paraphrased):

2021: To speed up project approval, Oil & Gas operations get carbon credits by buying electricity from the wind farms I’m installing to offset emissions from tar sands and other projects. They aren’t being built to replace natural gas or coal power plants, nor are enough being created to do so. Only insiders are aware of the tremendous amount of breakdowns. Major component failures are rapidly increasing in the newer generations of hardware, as the MW output per tower has now increased towards 6MW and 10MW from barely 2MW a decade ago. Siemens-Gamesa and Vestas are both plagued by widespread drive-train failures within a year of installation (in the case of 200+ turbines SGRE built this year in Canada, before the turbine was even turned on). The shift to “structural shell” technology in blades, where the blade skin is self-supporting rather than being bonded to an internal “spar”, has caused serial blade failure issues for all major manufacturers: Blades shredding and destroying an entire tower within 24 months of installation is, depressingly, increasingly common now. Vestas alone retrofitted nearly 15,000 blades over the past two years to try and rectify engineering flaws with the design. So no way could we build even one generation of renewables, not with this many breakdowns of major components needing repairs long before their lifespan is over, and now when wind turbine companies are close to insolvency, losing hundreds of millions of dollars every quarter.”

26. Large-scale wind energy slows down winds and reduces turbine efficiencies

2016-11-15. Phys.org. Original paper: Lee M. Miller et al. Wind speed reductions by large-scale wind turbine deployments lower turbine efficiencies and set low generation limits, Proceedings of the National Academy of Sciences (2016).

A new study published by scientists from the Max Planck Institute for Biogeochemistry in Jena, Germany, lowers the expectations of wind energy when used at large scales.

Every turbine removes energy from the winds, so that many turbines operating over large scales should reduce  speeds of the atmospheric flow. With many turbines, this effect should extend beyond the immediate wake behind each turbine and result in a general reduction of wind speeds. This wind speed reduction is critical, as it lowers the amount of energy that each turbine can extract from the winds.

Dr. Lee Miller, first author of the study, explains: “One should not assume that wind speeds are going to stay the same with a lot of wind turbines in a region. Wind speeds in climate models may not be completely realistic, but climate models can simulate the effect that many wind turbines have on wind speeds while observations cannot capture their effect.” The wind speed reduction would dramatically lower the efficiency by which turbines generate electricity. The authors calculated that when wind energy is used at its maximum potential in a given region, each turbine in the presence of many other turbines generates on average only about 20% of the electricity compared to what an isolated turbine would generate.

On land, they determined that only 3-4% of land areas have the potential to generate more than 1.0 watt of electricity per square meter of land surface, with a more typical potential of about 0.5 watt per square meter or less.

27. Offshore Wind Farms likely to be destroyed by Hurricanes

The U.S. Department of Energy has estimated that if the United States is to generate 20% of its electricity from wind, over 50 GW will be required from shallow offshore turbines. Hurricanes are a potential risk to these turbines. Turbine tower buckling has been observed in typhoons, but no offshore wind turbines have yet been built in the United States.  In the most vulnerable areas now being actively considered by developers, nearly half the turbines in a farm are likely to be destroyed in a 20-year period (Rose).

Source: Rose, S. 2 June 2011. Quantifying the Hurricane Risk to Offshore Wind Turbines.  Carnegie Mellon University.

During summer and early fall, global circulation brings frequent hurricanes that can affect the coastal and nearby inland regions extending from Texas to Nova Scotia. These would require repeated shutdown of all wind-generating facilities for a number of consecutive days and would repeatedly expose all turbines and their towers to serious risk of damage and possible prolonged repairs. One can argue that turbines should simply not be sited in these risky regions and that the needed power should come from the continent’s interior, where the machines would not be exposed to hurricanes, though they would remain vulnerable to frequent tornadoes (Smil 2010).

28. The costs of lightning damage are too high (Smith 2016, Froese 2015, Gromicko 2018)

Wind turbines are lightning magnets which can cause a great deal of damage. Blades explode; generators and control system electronics fry. And climate change is expected to increase lightning by 50%. The taller the windmill the more energy that can be captured since the strongest winds are at great heights, but lightning dangers increase with turbine height.

  • According to a German study, lightning strikes accounted for 80% of wind turbine insurance claims.
  • During its first full year of operation, 85% of the down time experienced by one southwestern commercial wind farm was lightning-related. Total lightning-related damage exceeded $250,000.
  • The German electric power company Energieerzeugungswerke Helgoland GmbH shut down and dismantled their Helgoland Island wind power plant after being denied insurance against further lightning losses. They had been in operation three years and suffered more than $540,000 (USD) in lightning-related damage.

Potential damage:

  • CONTROL SYSTEM.: These include sensors, actuators, and the motors for steering the equipment into the wind. According to the updated National Fire Protection Association handbook: “While physical blade damage is the most expensive and disruptive damage caused by lightning, by far the most common is damage to the control system”
  • ELECTRONICS: Wind turbines are deceptively complex, housing a transformer station, frequency converter, switchgear elements, and other expensive, sensitive equipment in a relatively small space
  • BLADE DAMAGE: A lightning strike to an unprotected blade will raise its temperature tremendously, perhaps as high as 54,000° F (30,000° C), and result in an explosive expansion of the air within the blade. This expansion can cause delamination, damage to the blade surface, melted glue, and cracking on the leading and trailing edges. Much of the damage may go undetected while significantly shortening the blade’s service life. One study found that wood epoxy blades are more lightning-resistant than GRP/glass epoxy blades; damage to generators; and batteries can be destroyed, or even detonated, by a lightning strike.

Even near lightning strikes weaken the blades and other components leading lead to serious turbine damage and downtime.

29. Wind doesn’t reduce CO2

See “In energy policy, Minnesota “Green” energy fails every test” or the original research paper “Energy Policy in Minnesota: The High Cost of Failure“.

30. Turbines increase the cost of farming

Building and maintaining a turbine requires heavy equipment that damages tiles under fields, which affects drainage in surrounding fields. Drainage problems can hurt crop yields and even stop a farmer from being able to plant in the first place. A turbine also makes it more difficult, or sometimes impossible, for crop dusters to fly over fields around it in order to spray pesticides that protect their crops Mensching 2017).

31. Offshore Windmills battered by waves, wind, ice, corrosion, a hazard to ships and ecosystems

Offshore windmills are battered by waves and wind, and ice is also a huge problem.

They must be much more reliable due to their vastly more challenging accessibility, rely on subsea power cable networks and substations far from land; and are coupled to a range of support structures, including floating systems that are highly dependent on water depth (DOE 2014).

Offshore windmills need special new vessels because offshore turbines are much larger than onshore, with cranes with maximum lift heights approaching 130 m and lifting capacities between 600 and 1,200 tons, blade lengths up to 80 meters, and rotors u to 165 meters using state-of-the-art composite fabrication facilities and extra special attention to ship blades to the project site.

In the United States  more than 60% of the offshore wind resource lies over water with depths of more than 60 m, but Offshore windmills need to be in water 60 meters or less. In 2008, all installations were in shallow water less than 30 meters deep.

Offshore windmills need to exist in water that’s 60 meters or less. Fifteen meters or less is ideal economically, as well as making the windmills less susceptible to large waves and wind damage.  But many states along the west coast don’t have shallow shelves where windmills can be built — California’s best wind, by far, is offshore, but the water is far too deep for windmills, and the best wind is in the northern part of the state, too far away to be connected to the grid.

Offshore windmills are a hazard to navigation of freighters and other ships.

The states that have by far the best wind resources and shallow depths offshore are North Carolina, Louisiana, and Texas, but they have 5 or more times the occurrence of hurricanes.

As climate change leads to rising sea levels over the next thousand years, windmills will be rendered useless.

Offshore windmills could conflict with other uses:

  1. Ship navigation
  2. Aquaculture
  3. Fisheries and subsistence fishing
  4. Boating, scuba diving, and surfing
  5. Sand and gravel extraction
  6. Oil and gas infrastructure
  7. Compete with potential wave energy devices

Offshore windparks will affect sediment transport, potentially clogging navigation channels, erosion, depositing of sediment on recreational areas, affect shoreline vegetation, scour sediments leading to loss of habitat for benthic communities, and damage existing seabed infrastructure.

Building windmills offshore can lead to chemical contaminants, smothering, suspended sediments, turbidity, substratum loss, scouring, bird strikes, and noise.

There is a potential for offshore wind farms to interfere with telecommunications, FAA radar systems, and marine communications (VHF [very high frequency] radio and radar).

Land use changes.  The windfarm offshore must be connected to the grid onshore, and there need to be roads to set up onshore substations and transmission lines.  Plus industrial sites and ports to construct, operate, and decommission the windmills.  Roadways need to be potentially quite large to transport the enormous components of a windmill (Michel)

Floating offshore turbines, tethered to fixed spots on the ocean floor rather than mounted directly to the seabed, exist only in prototype and concept stages of development. In addition to withstanding the greater corrosive properties of the marine environment, offshore turbines must be capable of withstanding a more complex structural vibration environment. Fleet availability has generally been lower and O&M costs higher for offshore installations. Further complicating offshore operations is the fact that maintenance access is more difficult and costly. In addition, balance-of-station costs in the form of complex foundations and underwater power collection and transmission systems are much greater for offshore wind energy projects (NREL 2014).

Installing offshore windmills requires excavation of the seafloor to create a level surface, and sinking the 250 to 350 ton foundations into the seabed, which are very expensive to build,since they require scour protection from large stones, erosion control mats, and so on.

Wind turbine foundations can affect the flow velocity and direction and increase turbulence. These changes to currents can affect sediment transport, resulting in erosion or piles of sediments on nearby shorelines.  Modified currents also could change the distribution of salinity, nutrients, effluents, river outflows, and thermal stratification, in turn affecting fish and benthic habitats.    Changes to major ocean currents such as the Gulf Stream could affect areas well beyond the continental United States, affecting the climate of North America as well as other continents (Michel).

32. Wind turbines are far more expensive than they appear to be

Willem Post goes into great detail about the true costs of wind energy with details from many wind projects around the world in A More Realistic Cost of Wind Energy.  The high cost of wind is hidden by enormous subsidies, beneficial tax rates, accelerated depreciation, not having to pay their share of energy storage, transmission lines, 7% loss of electricity over long transmission lines, and new power plants to back wind energy up when it isn’t producing. Nor does wind need to pay the additional costs of coal, nuclear, and natural gas plants for increased frequency of start/stop operation, keeping gas and coal plants available in cold standby mode, keeping some gas plants in synchronous (3,600 rpm) standby mode, and operating more hours in part-load-ramping mode (extra Btu/kWh, extra CO2/kWh)

George Taylor argues that wind costs at least twice as much in reality because of not having to pay for the conventional power plants that need to back it up, subsidies, tax depreciation, and so on in 2012 The Hidden Costs of Wind Electricity. Why the full cost of wind generation is unlikely to match the cost of natural gas, coal or nuclear generation

Corrosion costs aren’t added in either. Offshore windmills will be subject to a tremendous amount of corrosion from the salt water and air. Wind mills are battered year round by hail storms, strong winds, blizzards, and temperature extremes from below freezing to hundred degree heat in summer. Corrosion increases over time.

The same windmill can be beaten up variably, with the wind speed at the end of one blade considerably stronger than the wind at the tip of the other.  This caused Suzlon blades to crack several years ago.

Complexity: A windmill is only as weak as it’s weakest component, and the more components a windmill has, the more complex the maintenance.  Wind turbines are complex machines. Each has around 7,000 or more components, according to Tom Maves, deputy director for manufacturing and supply chain at the American Wind Energy Association (Galbraith).

Maintenance costs start to rise after 2 years (it’s almost impossible to find out what these costs are from turbine makers). Vibration and corrosion damage the rotating blades, and the bearings, gear boxes, axles, and blades are subjected to high stresses.

Gearboxes can be the Achilles’ heel, costing up to $500,000 to fix due to the high cost of replacement parts, cranes (which can cost $75,000-$100,000), post installation testing, re-commissioning and lost power production.

If the electric grid were to be built up enough to balance the wind energy load better, the windmills breaking down in remote locations would require a huge amount of energy to keep trees cut back and remote roads built and kept up to deliver and maintain the turbine and grid infrastructure.

Large scale wind farms need to “overcome significant barriers”: Costs overall are too high, and windmills in lower wind speed areas need to become more cost effective. Low wind speed areas are 20 times more common than high wind areas, and five times closer to the existing electrical distribution systems. Improvement is needed in integrating fluctuating wind power into the electrical grid with minimal impact on cost and reliability. Offshore wind facilities cost more to install, operate, and maintain than onshore windmills. NREL

Windmills wear out from ice storms, hitting insects, dust and sand abrade the blades and structure, and so on.

33. Wind turbines are already going out of business and fewer built in Europe

Investment in wind power is falling worldwide, especially in developing countries like China, which stopped building new turbines last month because most of the energy was being wasted. Wind power capacity is growing slowly because large numbers of people simply cannot get much of their electricity from wind.

Hundreds of wind turbines in the Netherlands are operating at a loss and could soon be demolished, according to an article published Thursday by the Dutch financial newspaper Financieele Dagblad.  Subsidies for generating wind energy aren’t cost effective anymore, according to the paper’s analysis. Most of Europe’s modern wind turbines are struggling to be profitable due to the inefficient subsidy structure.  Financieele Dagblad is extremely worried about the failure of the Dutch wind industry, because the Netherlands is already behind its green energy targets.

Dutch financial issues with wind power aren’t unique to the Netherlands. Globally, the wind power industry is slowing down and will continue to slow, according to a 2015 report by the International Energy Agency. The wind industry is growing the slowest rate in years due to changes in the structure of subsidies, issues with reliability, and consistently high prices.

34. TRANSPORTATION LIMITATIONS: Windmills are so huge they’ve reached the limits of land transportation by truck or rail

It will take too long to scale wind up to even a small fraction of what fossil fuels provide, because it takes a year of advance planning and up to 10 loads to move a single monster turbine.  Imagine how hard it is to find a route to take a 240 foot long blade to the destination.  It requires detailed route studies, obtaining local and state transportation permits, and trial runs to make sure that every turn and bridge underpass will work.  This reconnaissance team will also identify trees and utility poles that need to be removed.  Plus the wind turbine needs to be moved as well, and the largest weigh 700,000 pounds and need to be moved via ten diesel-burning trucks since the max road weight for trucks is 80,000 pounds in most states (Baker 2019).

The best sites with class 4+ wind (good to superb) near transmission and cities are gone.  Wind Turbines to capture class 3 (fair) or class 4+ at 100 meters are too big for roads and rail. The Department of Energy would like to make wind turbines 140 meters or higher to capture the greater windspeeds at that height, but limits to growth are already being hit for 100 meter turbines.

Wind blades over 53 meters (174 feet) too big for roads. Source: DOE. 2014. Wind vision: a new era for wind power in the U.S.

Wind blades over 53 meters (174 feet) too big for roads. Source: DOE. 2014. Wind vision: a new era for wind power in the U.S.

The U.S. market has expanded to include lower wind speed sites (average wind speeds <7.5 m/s) closer to population centers. This is in part because of technological advancements and policy drivers. In some regions, it is also due to limited access to available transmission lines. As a result, from 1998 to 2013, the average estimated quality of the wind resource at 80 m for newly installed wind projects dropped by approximately 10%. This trend has increased the complexity and cost of transportation logistics because components such as blades and towers have increased in size to capture the resource at lower wind sites. As a result, existing transportation infrastructure is increasingly impacting component designs to balance energy production with transportability.

Useful energy increases with the square of the blade length, and there’s more wind the higher up you go, so ideally you’d build very tall wind towers with huge blades.  But conventional materials can’t handle these high wind conditions, and new, super-strong materials are too expensive.

Transportation Logistics. Installed turbine power ratings have continued to rise, to an average of 1.95 MW in 2012 including multiple models at more than 2 MWs and above [53]. As OEMs seek to capture more wind at lower wind speed sites, average rotor diameters have increased rapidly. Tower components have also increased in size and weight to access better winds higher above the ground. Wind turbine blades longer than 53 m begin to present a transportation obstacle due to the large turning radius, which hinders right of way or encroachment areas within corners or curves on roads or railways. Tower sections are generally limited to 4.3 m in diameter, or 4.6 m where routes permit, to fit under overhead obstructions.

The increased size, mass, and quantity of wind components has resulted in more actively managed wind turbine transportation logistics, making use of a variety of land transportation methods and modes. This has resulted in increased project costs of up to 10% of capital costs for some projects.

Design Impacts. Transportation constraints increasingly impact the design of wind turbine components, leading to higher capital costs resulting from suboptimal design. A prime example can be found in the industry-standard rolled steel wind turbine towers, which are limited to a structurally sub-optimal 4.3 meters (14.1 feet) diameter to comply with size and weight limits of U.S. roads. While it is possible to construct towers with hub heights up to 160 m at this constrained diameter, this height results in an exponential increase in the mass and cost of rolled steel towers as shown below.

Figure 2-39. Estimates of trucking and capital costs for conventional tubular towers, 2013. Source: DOE. 2014. Wind vision a new era for wind power in the U.S.

Figure 2-39. Estimates of trucking and capital costs for conventional tubular towers, 2013. Source: DOE. 2014. Wind vision a new era for wind power in the U.S.

As towers get to be 100 meters high and more, and blade length increases, shipping them gets challenging. Trucks carrying big towers and blades must sometimes move with police escorts and avoid certain overpasses or small roads (Galbraith).

Installation. Because of the lift height and mass, hoisting a wind turbine nacelle onto its tower requires the largest crane capacity of all wind turbine construction and installation phases. The masses of a 3-MW nacelle assembly and a 5-MW nacelle assembly are approximately 78 metric tons (t) and 130 t, respectively, without the gearbox and generator (104 t and 173 t with those components installed). Continued increases in tower heights and machine ratings are driving higher nacelle and blade weights. As a result, the availability, scheduling, and logistics of larger cranes have become increasingly challenging.

Because mobile cranes capable of installing the majority of turbines deployed in the United States are of a common size used for construction and other industries, an ample supply of such cranes existed into 2014. As the number of turbines installed at 100 m hub heights and above has increased, however, concerns about the availability of larger capacity cranes has grown.

Another challenge with larger crane classes is difficulty transporting them to and maneuvering them within the wind plant, especially in complex terrain. A 1,600-ton crane has a width of nearly 13 m (41 feet), wider than a two-lane interstate highway (including shoulders), and requires more than 100 semi-tractor trailers to transport it between projects. This makes transportation between turbines difficult and costly.

Department of energy. 2014. Wind Vision: a new era for wind power in the U.S. APPENDIX J:

Over-the-road transportation has limitations because of the length, width, height, and weight of loads that vary across the United States (Table E-5).

Constraint Road Rail
Mass (metric tonnes) 75 >163
Length (meters) 53 53
Width (meters) 4.11 4.27
Height (meters) 4.57 > 4.57

Table E–5. Summary of Key Minimum Logistics Constraints

Most nacelles and large components are shipped on common 13-axle trailers, which have a load constraint of about 165,000 pounds. As weights move above that threshold, the number of available trailers drops dramatically and the use of dual-lane or line trailers is required. These trailers have diminishing returns in terms of cargo capacity because they are heavier. For example, the capacity of a 19-axle trailer (the largest conventional trailer) is approximately 225,000 pounds (102 metric tonnes), which is roughly equivalent to a 4-MW wind turbine nacelle with the drive train removed.

Wind turbine blades above 53 m in length also present a transportation obstacle due to the large turning radius, which hinders right-of-way or encroachment areas within corners or curves. Blade and tower transportation barriers are caused by the difficulty of trucking long blades with wide chords on U.S. roads (in the future, transportation of large diameter root sections will have similar concerns). This barrier limits the length of blade that can be transported over roadways to 53–62 m, depending on design characteristics of the blade, such as the amount of pre-curve and type of airfoils used in the region of the maximum chord dimension.

In addition to the physical limits, each state along a transportation route has different permit requirements. This problem is exacerbated by higher volumes of shipments to wider locations as wind turbine deployments have increased in number. States are also shifting the burden of proof for the safety of large high-volume shipments onto the wind industry. The increased complexity and resulting costs and delays associated with these challenges have led the American Wind Energy Association’s Transportation & Logistics Working Group to coordinate with the American Association of State Highway and Transportation Officials in standardizing the permitting process across states.

Constraints on road transport have also led to an increased use of rail as an alternative for heavy wind components, such as the nacelle; high-volume components; and long-distance shipments. Rail is capable of shipping very heavy loads, greater than 163 metric tonnes, and does not generally require permits for each state. However, rail imposes its own length and width constraints and is not available in every location in which wind energy is being developed.

Trade-offs between rail and road transportation can also be constrained by cargo widths. Rail clearances are affected by overall shape of the cargo but begin to be restrictive on widths greater than 4.27 m (14 feet [ft]). Road transportation is subject to lane clearing constraints on loads exceeding 4.11 m (13 ft, 6 inches). A few select lanes can be cleared for widths up to 4.57 m (15 ft) for towers, but this is not a common occurrence. Road transport cost is affected by width but roads are generally capable of moving widths up to 4.87 m (16 ft). Widths in excess of 3.66 m (12 ft) require escorts. Widths in excess of 4.57 m (15 ft) may also include police escorts, which escalate cost and complexity.

Height can be a challenge in road transport, but rail is often capable of accommodating tall cargo without issue. Most wind turbines require a loaded height (cargo plus trailer deck height) of 4.72–4.77 m (15 ft, 6 inches–15 ft, 8 inches) in order to clear the tallest cargo (e.g., the nacelle or tower). This height is often at the upper limits of many areas of the country for road transport. Tower diameters that exceed 4.57 m (15 ft) often complicate the ability to find a clear route to site.

The numbers in this section are representative constraints; specific routes around the country may be more or less restricted. The key point is that transportation logistics issues are increasing, which can cause delays and added costs, as well as suboptimal component design.

Crane Availability. The availability of smaller (120–150 metric tonnes) “support” crawler cranes may also become more limited as the number of installed turbines increases. These small cranes are used to off-load turbine components, and to support the larger cranes required for the heaviest of nacelles or greater than 100-m hub-heights. These small crawlers are used in all forms of construction, especially infrastructure, and as infrastructure projects gain momentum, the supply of these cranes should increase. With the decline in wind installations in 2013, crane manufacturers have realigned to supply ultra-large crawler cranes to the power generation and petro-chemical facilities. While development of machines to improve capacities at heights required by the wind industry continues, the pace of such investments has fallen considerably.

35. Windmills may only last 12 to 15 years, or at best 20 years

Mackay, M. 29 Dec 2012. Wind turbines’ lifespan far shorter than believed, study suggests. The Courier.

A study commissioned by the Renewable Energy Foundation has found that the economic life of onshore wind turbines could be far less than that predicted by the industry. The “groundbreaking” research was carried out by academics at Edinburgh University and looked at 3,000 onshore wind turbines and years of wind farm performance data from the UK and Denmark. The results appear to show that the output from windfarms — allowing for variations in wind speed and site characteristics — declines substantially as they get older. By 10 years of age, the report found that the contribution of an average UK wind farm towards meeting electricity demand had declined by a third. That reduction in performance leads the study team to believe that it will be uneconomic to operate windfarms for more than 12 to 15 years — at odds with industry predictions of a 20- to 25-year lifespan. They may then have to be replaced with new machinery — a finding that the foundation believes has profound consequences for investors and government alike.

Scotland’s landscape could be blighted by the rotting remains of a failed regeneration of wind farms, according to a scathing new report.

Mendick, R. 30 Dec 2012. Wind Farm Turbines wear sooner than expected. The Telegraph

The study estimates that routine wear and tear will more than double the cost of electricity being produced by wind farms in the next decade.

  • Older turbines will need to be replaced more quickly than the industry estimates while many more will need to be built onshore if the Government is to meet renewable energy targets by 2020.
  • The extra cost is likely to be passed on to households, which already pay about £1 billion a year in a consumer subsidy that is added to electricity bills.
  • The report concludes that a wind turbine will typically generate more than twice as much electricity in its first year than when it is 15 years old.
  • Author Prof Gordon Hughes, an economist at Edinburgh University and a former energy adviser to the World Bank, discovered that the “load factor” — the efficiency rating of a turbine based on the percentage of electricity it actually produces compared with its theoretical maximum — is reduced from 24 per cent in the first 12 months of operation to just 11 per cent after 15 years.
  • The decline in the output of offshore wind farms, based on a study of Danish wind farms, appears even more dramatic. The load factor for turbines built on platforms in the sea is reduced from 39 per cent to 15 per cent after 10 years.
  • The study also looked at onshore turbines in Denmark and discovered that their decline was much less dramatic even though its wind farms tended to be older.Prof Hughes said that may be due to Danish turbines being smaller than British ones and possibly better maintained.
  • He said: “I strongly believe the bigger turbines are proving more difficult to manage and more likely to interfere with one another. British turbines have got bigger and wind farms have got bigger and they are creating turbulence which puts more stress on them.It is this stress that causes the breakdowns and maintenance requirements that is underlying the problem in performance that I have been seeing”.
  • Prof Hughes examined the output of 282 wind farms —about 3,000 turbines in total — in the UK and a further 823 onshore wind farms and 30 offshore wind farms in Denmark.
  • “Bluntly, wind turbines onshore and offshore still cost too much and wear out far too quickly to offer the developing world a realistic alternative to coal.

Prof Hughes said his analysis had uncovered a “hidden” truth that was not even known to the industry. His report was sent to an independent statistician at University College London who confirmed its findings.

36. Not In My Back Yard – NIMBYism

There’s been a great deal of NIMBYism preventing windmills from being built so far. Some of the objections are visual blight, bird killing, noise, and erosion from service roads.

After 25 years of marriage, I still have to sometimes go downstairs to sleep when my husband snores too loudly, so I can imagine how annoying windmill noise might be.  And even more so after reading the  Noise Impact Assessment Report – Waubra Wind Farm, which makes the case that windmill noise affects the quality of life, disturbs sleep, and has adverse health effects with sounds of whooshes, rumble-thumps, whining, and clunks.  Low frequency sounds can penetrate walls and windows and cause vibrations and pressure changes.  Many people affected would like to come up with a standard that windmill farms must be at least 2 kilometers away and not exceed a noise level of 35 dB(A) at any time outside neighboring dwellings.

NIMBY objections to wind power appear often in the news:

NIMBY opposition is strong. Robert Bryce has a renewable rejection database, and since 2013, 375 wind farms and 120 solar farms have been rejected (Bryce 2023).

2023: Because December energy production of wind and solar is too low, it would require burning a lot of gas to compensate, and to go 100% renewable would drive electricity prices four to five times higher than what they are now.  Missing from California Air Resources Board’s model E3 is the cost and difficulty of building new transmission lines, especially those for offshore wind. The public will not stand for the number of new power lines needed to power California with just wind and solar from remote locations (Wurtz 2023).

2020-6-16 Offshore Wind Companies Are Racing To Develop America’s East Coast. First They Must Appease The Fishermen. The Bureau of Ocean Energy Management (BOEM) re-characterized the likely adverse effects of future offshore wind farms on commercial fisheries as “major.” 

2019-3-20. Missouri approves wind energy transmission line. Landowners vow to fight back

2019-2-25 Vacant-land mythology impedes serious energy discussions

37. Offshore wind turbines could affect fisheries

The Sierra club in Maine is asking the Minerals Management Service  to look at over a dozen aspects of wind offshore, including possible interference with known upwelling zones and/or important circulatory and current regimes that might influence the distribution or recruitment of marine species. Wind affects the upwelling of nutrients and may be a key factor in booms and busts of the California sardine fishery and other marine species.

Fishermen are worried about the impact offshore wind turbines will have on them, including some of the same concerns as the maritime transportation sector, including safety of navigation, ensuring turbines are spaced widely enough to allow maneuvering and the issue of misleading radar echoes that can be generating by turbine rotors. For mobile gear fishermen, there is fear that large parts of the leases could be effectively off-limits to them because towers are too close together to safely trawl of dredge.

38. Lack of a skilled and technical workforce

Wind power officials see a much larger obstacle coming in the form of its own work force, a highly specialized group of technicians that combine working knowledge of mechanics, hydraulics, computers and meteorology with the willingness to climb 200 feet in the air in all kinds of weather (Twiddy).

39. Wind only produces electricity, what we face is a liquid fuels crisis

We need liquid fuels for the immediate crisis at hand. Transportation, manufacturing, and 500,000 products made out of fossil fuels have no electrical processes.

40. Wind has a low capacity Factor

In the very best windmill farms, the capacity factor is only 28 to 35%.

Wind turbines generate electrical energy when they are not shut down for maintenance, repair, or tours and the wind is between about 8 and 55 mph. Below a wind speed of around 30 mph, however, the amount of energy generated is very small.

A 100 MW rated wind farm is capable of producing 100 MW only during maximum peak winds.  Most of the time it will produce much less, or even no power at all when winds are lighter or not blowing.  In reality, 30 MW of power production or less is far more likely.  What wind farms actually produce is called the CAPACITY FACTOR.

Quite often you will only hear that a new wind farm will generate 100 MW of power.  Ignore that and look for what the capacity factor is.

This makes a difference in how many homes are served. Per Megawatt, a coal plant up 75% of the time provides enough power in the Northeast for 900 homes and a wind plant up 30% of the time power for only 350 homes. The southhas extremely voracious electricity consumers, so the numbers are much lower: 350 and 180 respectively.

Solar generators typically have a 25 percent capacity factor, because the generators do not produce electricity at night or on cloudy days.

41. The quality of wind resources is location specific, with the best locations often found far from the load center

This image has an empty alt attribute; its file name is where-wind-blows-vs-population-in-China-3.jpg

Where the wind blows is often far from where people live, and the cost of building transmission lines so expensive wind turbines simply won’t be built – in fact, wind often appears to be cheaper than fossil fuels because the transmission cost and balancing costs of fossils aren’t included into their actual cost. As you can see above, the wind blows the strongest in China where the fewest people live.

42. Dead bugs and salt reduce wind power generation by 20 to 30%

Over time the build-up of dead insects and/or salt on off-shor turbine blades reduces power by up to 30%. Though with the insect apocalypse, perhaps this won’t be as much of a problem

43. Small windmills too expensive, too noisy, unreliable, and height restricted

According to the American Wind Energy Association, these are the challenges of small windmills: they’re too expensive for most people, there’s insufficient product reliability, lack of consumer protection from unscrupulous suppliers, most local jurisdictions limit the height of structures to 35 feet (wind towers must be at least 60 feet high and higher than objects around them like trees, etc), utilities make it hard and discourage people from connecting to the grid, the inverters that modify the wildly fluctuating wind voltages into 60-cycle AC are too expensive, and they’re too noisy.

44. Trucks are the foundation of civilization.  When diesel runs out, collapse will follow because mining, raw materials, and wind turbine parts won’t be made

When Trucks Stop Running, So Does Civilization. Energy and the Future of Transportation.

Why trucks can’t be electrified: See posts in Electric & Hydrogen trucks impossible

45. Germany’s Energiewiende is a failure

The goal of Energiewende was to make Germany independent of fossil fuels.  But it hasn’t worked out.  The 29,000 wind turbines and 1.6 million PV systems provide only 3.1% of Germany’s energy needs and have cost well over 100 billion Euros so far and likely another 450 billion Euros over the next two decades.  And even more than that if you add in the extra cost of maintaining fossil generation systems to back up the lack of wind and sun from seconds to weeks. 

Because of their extremely low energy density and need for a great deal of space, forests are being cut down, pits dug, and filled with hundreds of tons of reinforced concrete for wind turbines to stand on: 5 acres per turbine. With the forest no longer protecting the soil, it is now vulnerable to wind and rain erosion.

Because wind and solar farms get a guaranteed price for 20 years, they have no need to innovate, do research, or please customers, who paid them 176 billion euros for electricity with a market value of just 5 billion euros from 2000-2016.  This is money that taxpayers could have used to build bridges, energy efficient buildings, or renovate schools, which would create even more jobs than the wind and solar industry (Vernunftkraft 2018).

46. Wind turbines are more expensive to decommission than construct so are often not recycled, nor is there room for them in landfills

A wind turbine’s blades can be longer than a Boeing 747 wing, so at the end of their lifespan they can’t just be hauled away. Built to withstand hurricane-force winds, the blades can’t easily be crushed, recycled or repurposed. First, you need to saw through the lissome fiberglass using a diamond-encrusted industrial saw to create three pieces small enough to be strapped to a tractor-trailer. Tens of thousands of aging blades are coming down from steel towers around the world and most have nowhere to go but landfills. In the U.S. alone, about 8,000 will be removed in each of the next four years (Martin 2020).

A Vestas 6-MW turbine weighs 3,108 tonnes. Of that, 2286 is the foundation with 2174 tonnes the concrete and 112 tonnes the steel rebar within, nearly 75% of the turbine weight. It will not be recycled. Usually it will be left in place, with the top 3 to 5 feet removed and replaced with soil (Tazi 2019, Gennitsaris 2023, DOE 2023). If you look at scholar.google.com for recycling wind turbines, 99% of the papers are about the blades, it took me a while to find these three papers.  One reason the foundation is left behind is that the CO2 generated transporting it to the landfill would be quite high.

Researchers estimate the U.S. will have more than 720,000 tons of blade material 100 to 300 feet long to dispose of over the next 20 years, a figure that doesn’t include newer, taller higher-capacity versions.  The blades have no value as scrap (Stella 2019).

Taking apart a 720 foot tall, 300-foot three bladed turbine for recycling can be expensive, energy intensive, and cost more than construction, because takes it high-powered equipment to break down and haul away on specialized equipment. Turbine blades are made of really strong, durable resin and fiberglass (NPR 2019) for a bit of bend, but don’t have good scrap value. As mentioned earlier, it’s hard to get a wind turbine to its generation location, and it’s nearly as hard to take it to a landfill, since the pieces are so huge.

Turbines sit on top of thousands of cubic feet of steel and cement.  For example, at the San Roman Wind Farm before placement of the new turbines, the site was excavated to a depth of 10 feet and filled with a reinforcing cage containing 68.5 tons of steel and 18,000 cubic feet of cement. The steel towers were assembled in 65 to 100 foot segments.  

Turbines are dependent on petroleum, since their fiberglass is made from finite fossils, so it is a shame they can’t be re-used or renovated to be useful beyond the very short age of oil (Lozanova 2017).

Vestas claims it has a way to break the plastic in turbine blades down into virgin-grade material. It won’t be easy since they’re built to withstand elements for decades. but it is essential since by 2050 turbine blades will become 43.4 million tons of trash. It will be really amazing if they’ve come up with something, because the blades are made with epoxy, engineered to be nearly indestructible. It was made to withstand high temperatures and extreme conditions, so unlike plastics, you can’t melt it. Whatever Vestas has is not commercial yet and will take years to scale up if it works out in the laboratory. Nor is it clear if this recycles the epoxy to make it eternally reusable. Probably not, since plastic is down-cycled ever time and can only be recycled a few times. The chemicals could poison the environment as well, but what they are hasn’t been revealed by Vestas. In addition to the epoxy, half of the turbine has glass or carbon fibers, and it isn’t clear if Vestas is recycling them as well (Calma 2023).

47. Long transmission lines start fires

“With increased long distance electricity transmission, there is a need for increased maintenance of transmission lines. If this is not performed adequately, fires are likely, especially in dry, windy areas. There is recent evidence that inadequate maintenance of transmission lines is a major fire hazard. In California, inadequate electricity line maintenance has led to the bankruptcy of the Northern California utility PG&E. In recent weeks, PG&E has initiated two preventative cut-offs of power, one affecting as many as two million individuals. The Texas Wildfire Mitigation Project reports, “Power lines have caused more than 4,000 wildfires in Texas in the past three and a half years. Venezuela has a long distance transmission line from its major hydroelectric plant to Caracas. One of the country’s recent major electric outages seems to be related to fires close to this transmission line.”(Tverberg 2019).

48. It Costs $532,000 to Decommission A Single Wind Turbine (Orr 2019)

According to utility documents filed by Xcel Energy for it’s Nobles Wind facility, it will cost approximately $445,000 (in 2009 dollars) per turbine to decommission the wind facility. This means it would cost $532,000 per turbine (in 2019 dollars) for each of the 134 turbines in operation at this facility, bringing the total cost of decommissioning the Nobles project to $71 million. 

Other wind turbines have six-figure decommissioning costs, as well. According to utility documents for the Palmer’s Creek Wind facility in Chippewa County, Minnesota, it would cost $7,385,822 to decommission the 18 wind turbines operating at that site, a cost of $410,000 per turbine.

One would think such a price tag would at least result in a thorough decommissioning job, but one would be wrong.

According to the Nobles Wind document, “Restoration activities will include and not be limited to removal of all physical material and equipment related to the project to a depth of 48 inches.”

This means Xcel will only remediate the site to a depth of four feet, leaving most of the massive concrete foundations, which go as deep as 15 feet, used to anchor the wind turbines , in the ground indefinitely.

49. Wind turbines threaten biodiversity

Over 2200 renewable wind, solar photovoltaic, and hydropower energy facilities threaten the natural habitats of plant and animal species across the globe, with 922 more under development.  This infrastructure is degrading 886 protected areas, 749 key biodiversity areas, and 40 distinct wilderness areas (Rehbein 2020).  Renewable energy requires ten times the land area of a fossil fuel thermal facility to generate an equal amount of power.  Biodiversity is threatened by transmission lines and roads, which enable collisions, hunting, habitat loss, fragmentation, and invasive species dispersal. Hydropower dams negatively affect local, downstream and upstream biodiversity, by modifying sediments, nutrients and altering water flows (Rehbein 2020).

50. Wind turbines rely on natural gas and coal plants for energy storage

In a 100% renewable energy storage system mainly dependent on wind and solar, there needs to be a tremendous amount of energy storage for up to six weeks when there is little wind or sunshine. The only storage now is Pumped Hydro Storage which can store at best 2% of the energy generated a day in the 10 states that have hydropower, Compressed Air Energy Storage at just one place only in Alabama, and almost non-existent battery storage that can’t scale up to what’s needed due to lack of lithium and other minerals. This is why natural gas is THE energy storage today. Gas steps in when wind or sun stop, and steps out when they blow or shine so the grid doesn’t become unbalanced and black out. Gas is essential for the few days with peak demand when weather is very hot or cold, as well as the baseload power around the clock. The U.S. electric grid uses 35% of natural gas, and this percentage is expected to grow as coal and nuclear power plants continue to shut down.

This article explains why natural gas is essential to balance wind and solar:  Clemente, J. 2020. Germany proves how essential natural gas is. Forbes.

51. Operations and Maintenance (O&M) costs are too high (Greco 2013)

Renewable electricity generation from wind turbines presents unique challenges in reliability of their mechanical systems compared to utility-scale fossil fueled generation. The number of turbines and their distribution makes maintenance a difficult and infrequent task, and the peak loading events (caused by unsteady winds and grid faults) and harsh environmental conditions (temperature fluctuation and moister) result in extreme operation.

Consequently, wind turbine systems present one of the more challenging current practical bearings and gear problems:

  1. Contact failures in gear and bearing components have been the source of costly repairs and downtime of the turbine’s drivetrain and actuators.
  2. Gearboxes are commonly faced with abrasive wear, micropitting, scuffing, and macropitting issues.
  3. The nacelle yaw and blade pitch mechanisms commonly suffer from false brinelling and fretting damage.

Natural gas power Operations and maintenance (O&M) costs are half as much as wind turbines.

Sickinger T (2022) Wind bust. How an airborne blade exposed broader problems at PGE’s flagship wind farm. The Oregonian. https://projects.oregonlive.com/wind-farms/

A skinny blade, as tall as an 11-story building and weighing more than four Toyota Camrys, soared the full length of a football field. It plowed a furrow 4-feet deep in the wheat stubble where it eventually landed. Heavy-duty bolts that once kept the blade fastened to the tower scattered around the turbine base like shrapnel, some spiked deep into the soil. The broken bolts preceding the incident weren’t the only warning signs of problems at PGE’s flagship wind facility, which opened 15 years ago amid a push to expand green energy technology in Oregon and nationally. But it took the so-called “blade liberation” for PGE to take urgent action at Biglow Canyon, one of Oregon’s largest wind farms, shutting down all 217 turbines for testing and keeping some out of service for at least four months.  As wind farms grow older and the underlying components age, regular and proactive maintenance become far more important.

An investigation by The Oregonian/OregonLive has found that the seemingly isolated blade incident is part of a wider set of maintenance problems and equipment failures that are now undercutting electricity generation at Biglow Canyon, shortchanging ratepayers and landowners, and putting those who cultivate crops under the turbines – and potentially their farmland itself – at risk. PGE has failed to report public safety incidents at Biglow Canyon, in potential violation of its operating agreement with the state.  PGE knowingly operated at least four turbines at Biglow Canyon with broken blade bolts, in one case for nearly a year, maintenance records show. Oil leaks from Biglow Canyon’s wind turbines and transformers are environmental and fire hazards. The turbines have been plagued by leaks of oil and lubricants that coat towers and blades and spit on to their gravel pads and surrounding fields. Transformers have ruptured regularly, causing two fires and spilling about 3,000 gallons of mineral oil into surrounding soil that prompted expensive cleanups.  Ratepayers may end up footing the bill for assets that are no longer useful. The project’s 76 turbines manufactured by Vestas are halfway through their projected life but PGE is already considering replacing them. If that happens by the end of 2023, ratepayers would be stuck covering $156 million in remaining costs.

The Biglow Canyon turbine that launched its blade is one of about 72,000 machines nationwide, including some 2,300 turbines in Oregon, which has more production capacity than all but nine other states. Yet there is no effective national, state or county reporting requirement or database tracking safety or operational incidents at wind farms, and only 13 of the largest of Oregon’s 48 wind farms are regulated by the state.

Maintenance issues at Biglow Canyon matter broadly because PGE – Oregon’s largest electricity provider, serving some 900,000 homes and businesses in Oregon – plans to transition to 100% carbon-free energy by 2045. And its customers will be paying the bill.

To eliminate all its greenhouse emissions, PGE would need to supersize its fleet of renewable energy resources and manage them for longevity, maximizing production for decades to come. Yet the economics of wind power are heavily dependent on federal subsidies, and some experts suggest those subsidies are structured in a way that incentivizes operators to skimp on maintenance for older equipment that is no longer eligible.

52. Increasingly high insurance costs (IJ 2019)

The cost of insurance for wind and other renewables is increasing due to the frequency and severity of claims. Fifteen percent of claims in 2018 were due to extreme weather, wildfire, hurricanes, and tornadoes. This is happening due to component vulnerability, defective designs and changing original equipment manufacturer (OEM) warranties, along with extreme weather damage. Another issue is that

Accelerated build times have caused an unusual amount of material damage during construction. As construction firms have come under pressure to build projects more efficiently and in shorter timeframes, less experienced personnel are being used to handle increasingly complex equipment, resulting in a higher frequency and severity of claims, attendees were told.

At the same time, component failure has meant higher costs. The increased complexity of components makes them harder to replace in isolation. In wind energy, with newer blades, any component damage may mean replacing the entire blade, which raises operation and maintenance costs, according to the insurer.

Design issues in some uncertified models are resulting in equipment failure. While this issue may be resolved over time, both wind and solar projects remain vulnerable to mechanical and electrical breakdown in this period of continued technical innovation in the sector, the insurer said.

53. Gains from wind miniscule

At best  maximum wind capture is 60% (WE 2009), the best turbines now capture 45% (Pryor 2020), so future gains will be minimal (Mills 2020)

54. Wind turbine blades need to be de-iced in cold climates

This image has an empty alt attribute; its file name is blades-need-to-be-de-iced.jpg

Ice clinging to the blades of a wind turbine poses big problems. It adds weight and can throw the spinning blades out of balance, potentially damaging vital gear mechanisms. It also can change the aerodynamics of the blades, preventing the wind from making them spin. Ice throw is also dangerous to personnel.

Turbines in areas that have to deal with snow and ice usually have heating elements inside the blades to melt accumulating ice, but for safety, need to be shut down until the ice is gone, and don’t work if the temperature drops below -22 ºF (-30ºC)..  In addition, specialized “cold weather packages” are installed to keep crucial turbine components like the pitch and yaw motors, the gearbox, and battery warm. This adds to the overall cost, and subtracts from the Energy Return on Invested.

Another de-icing technique is to spray hot water onto the blade in the same way as when de-icing an aircraft, the difference is that you do it in the air. Even in cold weather areas with internal heating helicopter de-icing is sometimes required and takes about 1.5 hours.  The establishment of wind power in cold climates is an investment risk in terms of reduced production or  downtime due to icing on the blades (Gedda 2016). 

55.  Turbines are so heavy they damage roads during delivery

Though some of wind power’s down sides also have been well publicized, there is one negative factor that has received little media attention: damage to rural roads during construction of wind-energy facilities.

First, the large vehicle loads involved in wind-farm construction greatly exceed the designed capacities of most rural roads. For example, the gross weight of a truck carrying the turbine that will sit atop a typical 300-ft wind tower is 218,000 lb. The gross weights of trucks that carry tower sections vary from 134,000 lb to 232,000 lb. Another type of vehicle commonly used in wind-farm construction is the so-called rough-terrain crane. Each of these two-axle vehicles typically weighs 100,000 lb. A single pass by any of these loads can cause major damage to a gravel-surfaced road. In addition, many legal loads of concrete, rebar and gravel are hauled in to construct wind farms. To compound the matter, in northern climates, wind-power companies want to begin construction as early as possible in the spring—when roads are at their weakest.

Another problem is caused by the length of wind-generator blades. Blades currently being installed across the nation are up to 120 ft long, and 180-ft blades will be in use in some places in a few years. The vehicles that haul the blades require much wider turning radii than exist at typical rural crossroads. As a result, corners must be widened. In addition to issues such as compensation to land owners, obstruction of drainage ditches and destruction of crops, widening a corner can create problems that directly involve public-highway officials. Finally, wind developers not only traverse county roads, but they also construct entrances from those roads and field drives to the towers. There are safety issues involved in deciding on the placement and number of these entrances. Also, the entrances interrupt drainage ditches, so standards for culverts and their placement come into the picture. Furthermore, driving heavy loads over agricultural land often endangers drainage tile lines (Kronick 2011).

Delivery of turbines to wind farms in Minnesota produced heavy construction traffic that most county roads were not designed to accommodate. These construction projects can cause severe damage to the roadways, generating truck traffic in one season that can exceed 20-year estimates used in design (MnDOT 2013).

56.  The best, low-cost areas have already been fully developed in several states

Because of this stranding far from transmission lines, very little of the potential power that could be harvested from wind will actually be realized. The National Renewable Energy Laboratory added up the undeveloped prime and non-prime renewable power potential in one of the country’s three major grids, the 11 Western interconnection states (WECC). Don’t think you can read this report and get in first on the wind rush. The best, low-cost areas have already been fully developed in California, Oregon, Utah, and Washington. And perhaps other states by now as well, it is 2022 as I write this. The remaining non-prime resources will cost more and be less productive. Total potential future renewable generation was 378 TWh (148 TWh prime, 230 TWh non-prime)(NREL 2013). This is less than the current 481 TWh of fossil and nuclear power production in these states (EIA 2013).

57. Not enough metallurgical coal to make the steel for wind turbines (peak coal)

The average wind turbine needs 170,000 kg of steelmaking coal to produce the 260,000 kg of steel required (Venditti 2022).  Nor are there alternative ways to make high quality steel, with only 30% of steel being recycled with electric arc furnaces. There is no commercial hydrogen, biofuel or other renewable process to make steel (Friedemann 2021).

58. When oil prices rise, the cost to build wind turbines rises too

Since every single step of constructing wind turbines depends on oil, coal, and natural gas, and with peak oil likely happening in 2018, steel prices have tripled as have other components of turbines. Russia has been providing 10% of world oil and 25% of world natural gas so prices are likely to rise even more.

59. Electricity can’t make cement, steel, glass, bricks, ceramics and more

So how are wind turbines going to reproduce exactly?  For details see Chapter 9 Manufacturing uses half of all Fossil Energy in “Life After Fossil Fuels: A Reality Check on Alternative Energy”. There are no electric processes to make metals and cement (an electric arc furnace can only melt existing steel and so only 30% of steel is made this way, the other 70% from raw iron).  Cement has no process. In fact much of the most important manufacturing relies on the high heat that only fossil fuels can deliver.

Even if there were electrical processes to replace fossil fuels in industry, the current US electric grid is badly mismatched for the job. Why is that? Because twothirds of US electricity comes from fossil fuels, and 66% of coal and natural gas energy is lost as heat at the power plant when making electricity. Yet another 4–10% is lost over the wires, so only 24–30% of the energy contained in fossil fuels reaches a factory. Right now, it is three times more energy-efficient to create heat directly through the burning of fossil fuels than with electricity (EIA 2013). More wind and solar electricity would narrow that efficiency gap, but not erase it. Currently, only 9% of electricity comes from wind and solar (EIA 2020a).

Fahrenheit      Products

1710– 3000    Nonmetal melting Plastics, rubber, food preparation, softening

1330– 3000   Smelting and metal melting. Steelmaking and other metal production, glass, ceramics

1150– 2640  Cement Calcining 1652 F Sintering 2640 F

1330– 3000  Metal heat treating and reheating Hardening; annealing, tempering, forging, rolling

710–2010    Coking Ironmaking and other metal production

and more  Source: DOE (2015a, b), Friedmann et al. (2019), Sandalow et al. (2019)

60. Wind turbines are ecologically destructive

Bol (2020) 14 million trees have been cut down in Scotland to make way for wind farms. Steve Micklewright, CEO of Trees for Life, said: “It seems deeply ironic that trees are being felled to make way for windfarms when both healthy growing forests and renewable energy are important in resolving the global climate emergency.  “Woodlands that are ancient or of high conservation value should not suffer from mass felling because other rare and endangered plants and animals can be lost too. In other locations, such as plantations where the trees would have been harvested anyway, a pragmatic approach would be to ensure the timber is used for buildings or other uses that will not release the carbon stored in the trees back into the atmosphere.”

Lyndsey Ward, a Highlands wind farm activist, said: “Not only are millions of CO2 absorbing trees being felled for turbines, hundreds of thousands of acres of ancient carbon-holding peat are being dug up too…and if you add in the infrastructure requirements and grid connections, many more trees will have been sacrificed and peat lost as remote wind factories are connected to a grid that cannot cope with them.”

McDougal (2022) writes that Scotland was once nearly all forested, until only 4% remained. But lately tree planting has upped the forests to 15% of the landscape, though still vast areas remain forest free, in part because it’s hard to grow them where sheep have hardened the soil or bogs make it too soggy for them (which exist because forests were cut down)

61. Take too long, too expensive despite energy shocks in the EU from Russia’s destruction of natural gas pipelines

In Germany planning a wind turbine involves 50 different agencies each of which can stall a project. No wonder Matthias Frauen’s two wind turbines took seven years to plan, permit, and build.  But an emergency liquefied natural gas terminal took just 10 months, allowing Germans to continue to manufacture goods an dheat their homes after NG pipelines from Russia were blow up.  Although the crisis caused Germany to allow 2% of their land to wind turbines, and hope to deliver 80% of electricity from wind and solar by 2030, that would require 1500 wind turbines a year,.  Not likely with costs having gone up 40%, making it difficult to finance more of them. Plus suppliers have lost billions and laid off many employees (Morris 2023).

62. Supply chains: wind turbines need 10 times the materials of conventional energy technologies

Siemens Energy CEO Christian Bruch said “Never forget, renewables like wind roughly, roughly, need 10 times the material [compared to] what conventional technologies need. So if you have problems on the supply chain, it hits … wind extremely hard, and this is what we see” (Frangoul 2022).

63. As more and more wind turbines are built, the average capacity factor goes down

USA & Australia wind capacity factors were 33-35% on average in 2019, no higher than in 2012 because technologies haven’t improved much, and where the best locations for wind energy are saturated, new wind farms in less favorable areas have a reduced capacity factor, even with a higher hub height and rotor, since the land required increases.   Without energy storage, a grid dependent on wind and solar energy is impossible. The average wind capacity factor per year or even month can’t be used to calculate how much energy storage is needed, because it oscillates so much seasonally and even within minutes (Boretti 2020).

64. Wind turbines are buckling and toppling, splatting wind blades across fields below

Turbines have fallen in five states and across Europe recently, some 750 feet tall, buckling in half and splatting their enormous blades across the fields below. Though just a small fraction of turbines, it adds hundreds of millions of dollars to manufacturer costs, on top of higher costs of materials and supply chain failures. Even larger turbines are being made, and the higher they go, the harder they fall (IER 2023).

65. We can’t make wind turbines more efficient because we don’t understand turbulence

Wind energy is a critical part of the global energy transition, and yet there is one fundamental issue that physicists and engineers have been unable to solve. Reliability is a cornerstone of effective and efficient renewable energy technologies, and our inability to predict turbulence could reduce output by as much as 30%. This all comes back to one of the $1 million Millennium Prize problems, with mathematicians so far unable to construct a model of fluid dynamics to help solve this kind of problem (Zaremba 2023)

66. Peak wind? Wind generation declined in 2023 for the first time since the 1990s

U.S. electricity generation from wind turbines decreased for the first time since the mid-1990s in 2023 despite the addition of 6.2 gigawatts (GW) of new wind capacity last year. Data from our Power Plant Operations Report show that U.S. wind generation in 2023 totaled 425,235 gigawatthours (GWh), 2.1% less than the 434,297 GWh generated in 2022.

The 2023 decline in wind generation indicates that wind as a generation source is maturing after decades of rapid growth.

My observation: The best spots for wind were already built out in California in 2014, newer spots with less wind are not as profitable.

And if you look at Robert Bryce’s Renewable Rejection Database, you will see that a record 427 wind farms were rejected by local NIMBYism in 2024. http://0v9.95b.mywebsitetransfer.com/renewable-rejection-database/

67. Betz Limit of 59% — another 10-fold increase is not possible

The laws of physics mean that the absolute maximum of wind that can be captured is 59%, according to Betz’s law. Capturing all the kinetic energy would mean, by definition, no air movement and thus nothing to capture. There needs to be wind for the turbine to turn. Modern turbines already exceed 45% conversion. That leaves some real gains to be made but, as with combustion engines, nothing revolutionary. Another 10-fold improvement is not possible.

REFERENCES

Anderson, J. March 1, 2017. You Can’t Have Offshore Wind Power Without Oil. Forbes.

Baker, L. 2019. Shipping wind turbines is not a breeze. It takes a year of advance planning and up to 10 loads to move a single monster turbine. freightwaves.com

Boretti A, Castelletto S (2020) Trends in performance factors of wind energy facilities. Springer Nature Switzerland AG.  https://link.springer.com/article/10.1007/s42452-020-03526-z

Bryce R (2023) Renewable Rejection Database. https://robertbryce.com/renewable-rejection-database/

Calma J (2023) How a wind industry giant plans to solve its plastic waste problem. The Verge https://www.theverge.com/2023/2/13/23594847/vestas-wind-energy-turbine-blade-reycling-plastic-waste

Castelvecchi, D. March 2012. Gather the Wind. If renewable energy is going to take off, we need good ways of storing it for the times when the sun isn’t shining and the wind isn’t blowing.  Scientific American.

Cembalest, Michael. 21 Nov 2011. Eye on the Market: The quixotic search for energy solutions. J. P. Morgan.

Cubic Mile of Oil.  Wikipedia.

DATC. September 23, 2014. $8-billion green energy initiative proposed for Los Angeles. Duke American Transmission Co.

Davidsson, S., et al. 2012. A review of life cycle assessments on wind energy systems. The International Journal of Life Cycle Assessment.

Davidsson, S., et al. 2014. Growth curves and sustained commissioning modelling of renewable energy: Investigating resource constraints for wind energy. Energy Policy

De Castro, C. 2011. Global Wind Power Potential: Physical and technological limits. Energy Policy.

DOE (2015a) Industrial process heating – Technology assessment. U.S. Department of Energy

DOE (2015b) Manufacturing energy and carbon footprint. Sector: All manufacturing. U.S. Department of energy. ttps://www.energy.gov/eere/amo/manufacturing-energy-andcarbon-footprints-2014-mecs.

DOE (2023) Wind energy end-of-service guide. U.S. Department of energy. https://wnrcde.org/wp-content/uploads/2023/08/windturbine-guide.pdf

EIA (2013) Electricity use by machine drives varies significantly by manufacturing industry. U.S. Energy Information Administration

EIA (2020a) Net generation by Energy Source Table 1.1, Net Generation from Renewable sources.Table 1.1.A. U.S. Energy Information Administration

EIA (2024) Wind generation declined in 2023 for the first time since the 1990s. U.S. Energy Information Administration. https://www.eia.gov/todayinenergy/detail.php?id=61943

E.ON Netz Corp. Wind Report 2004.Renewable Energy Foundation. E.ON Netz Wind report 2005 shows UK renewables policy is mistaken.

Elvidge, C. D. 2004. U.S. constructed area approaches the size of Ohio. Eos 85:233-34.

Fisher, T. Oct 23, 2013. Big Wind’s Dirty Little Secret: Toxic Lakes and Radioactive Waste. Institute for Energy Research.

Frangoul A (2022) The energy transition will fail unless industry fixes wind power issues, Siemens Energy CEO says. CNBC. https://www.cnbc.com/2022/11/17/energy-transition-will-fail-unless-wind-power-fixes-problems-ceo.html

Friedemann A (2021) Chapter 9: Life After Fossil Fuels: A Reality Check on Alternative Energy. Springer

Friedmann SJ, Fan Z, Tang K (2019) Low-carbon heat solutions for heavy industry: sources, options, and costs today. Center on Global Energy Policy at Columbia University SIPA, New York

Froese, M. 2015. Damage control: effects of near-lightning strikes on turbine blades. Windpowerengineering.com

Galbraith, K. 7 Aug 2011. Wind Power Gains as Gear Improves. New York Times

Gattie, D. 2019. 100 percent renewable energy isn’t a response to climate change — it’s a retreat. The Hill.

Gedda H et al (2016) Airborne de-icing solutions for wind turbines. Vindforsk IV. Energiforsk.

Gennitsaris S (2023) Integrated LCA and DEA approach for circular economy-driven performance evaluation of wind turbine end-of-life treatment options. Applied Energy.  https://doi.org/10.1016/j.apenergy.2023.120951

Greco A, et al. 2013. Material wear and fatigue in wind turbine systems. Wear: 1583-1591.

Gromicko, N. 2018. Wind turbines and lightning. Nachi.org  https://www.nachi.org/wind-turbines-lightning.htm

Gruver, M. September 24, 2014. Renewable energy plan hinges on huge Utah caverns. Associated Press.  https://apnews.com/ee7056a6bbe24d3a92029ed607603529

Guezuraga, B. 2012. Life cycle assessment of two different 2 MW class wind turbines. Renewable Energy 37:37-44.

IEA. 2013. Wind task 25 Design and operation of power systems with large amounts of wind power. Phase two 2009–2011. International Energy Agency

IEA. 2020. Clean energy progress after the Covid-19 crisis will need reliable supplies of critical minerals. International Energy Agency.

IEC. 2014. Wind speed and power. Iowa Wind Center.

IJ (2019) Why insurance claims in Renewable energy industry are rising. Insurance journal.

IER (2023) Wind turbine collapses are supposedly rare, but several have occurred. Institute for Energy Research

Kronick RL (2011) Road Maintenance: Damaging wind farms. Roads & Bridges.

Lozanova, S. 2017. Can wind turbines be recycled? Earth911.c9om

Martin, R. April 7, 2016. Texas and California have too much renewable energy. The rapid growth of wind and solar power in the states is wreaking havoc with energy prices. MIT Technology Review.

Martin, C. 2020. Wind turbine blades can’t be recycled, so they’re piling up in landfills. Bloomberg.

Mason, V. 2005. Wind power in West Denmark. Lessons for the UK.

McDougal (2022) Why Are There No Trees in Scotland?. travelness.com

Mensching, L. M. 2017. Wind energy isn’t a breeze. Slate.com

Michel, J, et al. July 2007. Worldwide Synthesis and Analysis of Existing Information Regarding Environmental Effects of Alternative Energy Uses on the Outer Continental Shelf. U.S. Department of the Interior. Minerals Management Service. OCS STUDY MMS 2007- 038

Miller LM, et al (2011) Jet stream wind power as a renewable energy resource: little power, big impacts. Earth System Dynamics, 2011; 2 (2): 201 DOI: 10.5194/esd-2-201-2011

Miller LM, et al. May 16, 2014.  Two methods for estimating limits to large-scale wind power generation. Proceedings of the National Academy of Sciences.

Miller LM, Keith DW (2018) Climatic impacts of wind power. Joule 2: 2618-2632.

Miller LM, Keith DW (2021) Observation-based solar and wind power capacity factors and power densities. Environmental Research Letters 13.

Mills MP (2019) If you want ‘renewable energy,’ get ready to dig. Building one wind turbine requires 900 tons of steel, 2,500 tons of concrete and 45 tons of plastic. Wall Street Journal.

Mills M (2020) Have you ever heard of unobtainium? Manhattan Institute, Prager U. 

MnDOT (2013) Estimating the Traffic Impact on County Roads from Wind Turbine Construction. Minnesota Department of Transportation.

Morris L (2023) Germany built LNG terminals in months. Wind turbines still take years. Washington Post. https://www.washingtonpost.com/world/2023/01/07/germany-wind-energy-greens/

Munsell, M. 2019. Looming Supply Chain Crunch Threatens US Wind Energy Boom. More than $2.1 billion in turbine sales and PTC payments are in jeopardy. GreenTechMedia.com

Nelder, C. 31 May 2010. 195 Californias or 74 Texases to Replace Offshore Oil. ASPO Peak Oil Review. Germany built LNG terminals in months. Wind turbines still take years.

NPR. September 13, 2019. Podcast: How AI is influencing decisions in police departments. Science Friday.

NREL. 2013. Beyond renewable portfolio standards: An assessment of regional supply and demand conditions affecting the future of renewable energy in the west. Golden: National Renewable Energy Laboratory.

NREL. 2014. Renewable Electricity Futures Study Exploration of High-Penetration Renewable Electricity Futures. National Renewable Energy Laboratory.

Orr, I. 2019. It costs $532,000 to decommission a sngle wind turbine. Center of the American Experiment.

Parliament.uk. 21 Sep 2005. Memorandum submitted by Paul Mobbs, Mobbs’ Environmental Investigations. Select committee on environmental audit.

Parry, Simon. 11 Jan 2012.  In China, the true cost of Britain’s clean, green wind power experiment: Pollution on a disastrous scale. Dailymail.co.uk

Pfotenhauer, N. May 12, 2014. Big Wind’s bogus subsidies. U.S. News.

Pryor SC et al (2020) 20% of US electricity from wind will have limited impacts on system efficiency and regional climate. Scientific Reports 10: 541

Radford. 2016. Renewable energy demands the undoable. Climate news network.

Rehbein, J. A., et al. 2020. Renewable energy development threatens many globally important biodiversity areas. Global Change Biology.

Rose, S. et. al. 10 Jan 2012. Quantifying the hurricane risk to offshore wind turbines. Proceedings of the National Academy of Sciences.

Rosenbloom, E. 2006. A Problem With Wind Power. aweo.org

Sandalow, D, Friedmann J, Aines R, et al (2019) ICEF Industrial heat decarbonization roadmap. Innovation for Cool Earth Forum. https://www.icef-forum.org/roadmap/

Seattlepi. 2019. What happens when wind turbines get too old? Seattlepi.com

Shellenberger, M. 2019. With ethanol And biomass no longer viewed as ‘Green,’ will other renewables soon follow? Forbes.

Smil, V. 2008. Energy in nature and society. MIT Press.

Smil, V. 2010. Energy myths and realities. AEI press.

Smith, K. J. 2016. Surge protector. Scientific American.

Stella, C. 2019. Unfurling the waste problem caused by wind energy. NPR.org

Tazi N (2019) Waste and material flow analysis in the end-of-life wind energy system. Resources, conservation, and recycling.  https://doi.org/10.1016/j.resconrec.2019.02.039

Takemoto, Y. 31 Aug 2006. Eurus Energy May Scrap Wind Power Project in Japan.  Bloomberg.

Temple, J. 2018. Wide-scale US wind power could cause significant global warming. MIT Technology Review.

Trainer, T., 2012. A critique of Jacobson and Delucchi’s proposals for a world renewable energy supply. Energy Policy 44, 476–481.

Tverberg, G. 2019. How Renewable Energy Models Can Produce Misleading Indications. Ourfiniteworld.com

Twiddy, D. 2 Feb 2008. Wind farms need techs to keep running. Associated Press.

Udall, Randy. How many wind turbines to meet the nation’s needs? Energyresources message 2202

USGS. 2011. Wind Energy in the United States and Materials Required for the Land-Based Wind Turbine Industry From 2010 Through 2030. U.S. Geological Survey.

Venditti B (2022) Understanding Global Demand for Steelmaking Coal. VisualCapitalist.

Vernunftkraft. 2018. Germanys Energiewende – where we really stand. Bundesinitiative für vernünftige Energiepolitik, Vernunftkraft.

WE (2009) Can we Overcome the Betz Limit in Windpower Extraction? Windpower Engineering.

Wiley, L. 2007. Utility scale wind turbine manufacturing requirements. Presentation at the National Wind Coordinating Collaborative’s Wind Energy and Economic Development Forum, Lansing, Mich., April 24, 2007.

Woodford J (2024) World’s biggest onshore wind turbine blades unveiled in China.  New Scientist.

Wurtz C (2023) Grid Expert: Replacing Diablo Canyon Nuclear Plant with Renewables ‘Can’t Be Done’. To go 100% renewable would drive electricity prices four to five times higher. California Globe https://californiaglobe.com/articles/grid-expert-replacing-diablo-canyon-nuclear-plant-with-renewables-cant-be-done/

Zaremba H (2023) The $1 Million Math Problem Undermining Wind Energy. https://oilprice.com/Energy/Energy-General/The-1-Million-Math-Problem-Undermining-Wind-Energy.html

More articles on wind problems in various areas (not cited above)

Clover, C. 9 Dec 2006. Wind farms ‘are failing to generate the predicted amount of electricity‘. Telegraph.

Means, E. Jan 12, 2015. Scotland Gagging on Wind Power. Energy Matters.

Not on the internet anymore:

Blackwell, R. Oct 30, 2005. How much wind power is too much? Globe and Mail.

Wind power has become a key part of Canada’s energy mix, with the number of installed wind turbines growing exponentially in recent months. But the fact the wind doesn’t blow all the time is creating a potential roadblock that could stall growth in the industry.

Alberta and Ontario, the two provinces with the most wind turbines up and whirling, face concerns that there are limits on how much power can be generated from the breeze before their electricity systems are destabilized.

Alberta recently put a temporary cap on wind generation at 900 megawatts — a level it could reach as early as next year — because of the uncertainty. And a report in Ontario released last week says that in some situations more than 5,000 MW of wind power, stable operation of the power grid could be jeopardized.

Warren Frost, vice-president for operations and reliability at the Alberta Electric System Operator, said studies done over the past couple of years showed there can be problems when wind contributes more than about 10 per cent of the province’s electricity — about 900 MW — because of the chance the wind could stop at any time.

Each 100 MW of wind power is enough to supply a city about the size of Lethbridge, Alta.

If the power “disappears on you when the wind dies, then you’ve got to make it up, either through importing from a neighbouring jurisdiction or by ramping up generators,” Mr. Frost said.

But Alberta is limited in its imports, because the provincial power grid has connections only with British Columbia and Saskatchewan. And hydroelectric plants with water reservoirs, which can turn on a dime to start producing power, are limited in the province. Coal-fired plants and most gas-fired plants take time to get up to speed, making them less useful as backups when the wind fails.

There can also be a problem, Mr. Frost noted, when the wind picks up and generates more power than is being demanded — that potential imbalance also has to be accounted for.

There are a number of ways to allow wind power to make up a greater proportion of the electricity supply, but they require more study, Mr. Frost said. First, he said, the province can develop more sophisticated ways of forecasting the wind so the power it generates is more predictable.

The province could also build more plants that can quickly respond if the wind dies down during a peak period, for example. But building new gas-powered plants merely to help handle the variability of wind is certain to raise the ire of environmentalists.

The province could also increase its connections to other jurisdictions, where it would buy surplus power when needed. Alberta is already looking at links with some northwestern U.S. states, including Montana.

Over all, Alberta is committed to “adding as much wind as feasible” Mr. Frost said. “What we’re balancing is the reliability [issue].

Robert Hornung, president of the Canadian Wind Energy Association, which represents companies in the wind business, said he prefers to think of Alberta’s 900 MW limit as a “speed bump” rather than a fixed cap.

“We have every confidence they’ll be able to go further than that,” Mr. Hornung said, particularly if the industry and regulators put some effort into wind forecasting over the next year or so. That’s crucial, he said, because “we have projects of many, many more megawatts than 900 waiting to proceed in Alberta.

In Ontario, the situation is less acute than in Alberta, but the wind study released last week — prepared for the industry and regulators — shows some similar concerns.

While wind power could be handled by the Ontario grid up to 5,000 MW — about 320 MW of wind turbines are currently in operation with another 960 MW in planning stages — the situation changes at higher levels, the study suggests.

Particularly during low demand periods when wind makes up a relatively high proportion of the power mix, “stable operation of the power system could be compromised” if backup systems can’t be ramped up quickly to deal with wind fluctuations, the report said.

But Ontario is in a better position than Alberta because it has far more interconnections with other provinces and states, where it can buy or sell power.

And it also has its wind turbines more geographically dispersed than Alberta, where most wind farms are in the south of the province. That means the chance of the wind failing everywhere at the same time is lower in Ontario.

Don Tench, director of planning and assessments for Ontario’s Independent Electricity System Operator, said he thinks better wind forecasting is the key to making the new source of power work effectively.

“If we have a few hours notice of a significant wind change, we can make plans to deal with it,” he said.

Mr. Frost, of the Alberta system operator, said European countries such as Denmark and Germany have been able to maintain a high proportion of wind power in their electricity systems mainly because they have multiple connections to other countries’ power grids. That gives them substantial flexibility to import or export power to compensate for wind fluctuation.

Germany, for example, has 39 international interconnections, he said, making variable wind conditions much easier to manage.

This entry was posted in Alternative Energy, An Index of Best Energyskeptic Posts, Energy, Wind and tagged , , , , , , , , , , , , . Bookmark the permalink.